User manual
21
Mounting the Flue Outlet
The flue system should be mounted according to the following instructions :
a ) roof mounted b) side mounted
6.4.1
1. Cut a 92mm x 65mm oval in the roof
or the outer wall. The distance from the cut
to the connections must be a maximum
of 1500 mm vertically and 1300 mm
horizontally ( always with an upwards
direction). Insulation of the exhaust pipe
is recommended at an installation with a
length of the pipe more than 1m. By this
fast cooling of the exhausts is prevented
while winter operation (icing).
2. Drill holes for the screws in accordance
to the measurements shown in diagram.
(
Ø
4mm , square of 72mm x 72mm)
3. Put the sealing ring (E) under the bottom
part of the valve (F) and fit it to the wall or
the roof.
4. Connect the fresh air hose (B) to the
valve of the air inlet (C) with a clamp.
5. Put the top part (G) on the bottom part
and tighten it with screws.
(The screws are not supplied by Dometic )
6. Connect the exhaust pipe (A) to the
valve of the flue outlet (D) with the bolt.
(B)
(C)
(C, D)
(A)
(A)
(B)
(D)
Bending radius :
Exhaust pipe : 25mm
Fresh air hose: 55mm
Do not step on the flue outlet !
(G)
(F)
(E)
7
2
±
0
.2
o 72 m
ax.
72 ± 0.2
2
2
d = 130
61
USE THE SEALING
RING AS TEMPLATE
Distance flue outlet to the next window /opening
at least 500 mm
This order of assembly could vary
according to the particular
built-in situation.