Owner`s manual

9210-065-H-2-13
14
1.5 Installation #2
Pad depth is determined
by soil conditions and
local building codes.
Minimum depth is 18
inches.
Reinforced concrete
recommended.
DO NOT set anchor bolts
in wet concrete. Sleeve
anchors should be used
after concrete has cured
for greater flexibility in
positioning the pedestal
stand on the pad.
4” Minimum Above Ground
39”
Conduit
Conduit suggestions:
High voltage conduit
Low voltage access control device conduit
Automatic exit loop conduit
Reverse loop conduit
Gate
1”
The operator is heavy. Two persons are required when handling
the operator during installation.
Caution: DO NOT lay the operator on it’s side or oil will leak out
of the gear reducer.
1. Assemble and install the pedestal mounting stand kit (P/N
9200-135) on the concrete pad, then mount the operator to it.
Follow the instructions that came with the pedestal mounting
stand kit for assembly of the stand.
2. Move the idler wheels to the lower operating position in the
operator AFTER the operator has been installed on the pedestal
mounting stand. See the previous page’s instructions to gain
access inside the operator.
3. Install chain tray kit on the gate (See next page for details).
22”
1.75”
11.625”
4”
11.625”
4” 4”
15.75”
11.75”
6.25”
4”
Concrete Pad
Concrete Pad
Conduit
Area
Important: Pedestal
mounting stand MUST
be parallel to gate!
Pedestal mounting
stand MUST be level!
1/2
To attach pedestal
stand to concrete
pad DoorKing
recommends
sixteen (16)
1/2” x 3” sleeve
anchors
(not supplied).
Operator Mounted on the Heavy-Duty
Pedestal Mounting Stand
Wire Mesh