Owner`s manual

30
5.1.5 OPERATION TEST
BEFORE TESTING THE BACKUP POWER SYSTEM, BE SURE THAT ALL WIRING IS
COMPLETE AND THAT THE BATTERIES ARE PROPERLY CONNECTED AND FULLY
CHARGED.
1. Place the main AC input circuit breaker to the ON position. Place each of the branch
circuit breakers that are being used to the ON position.
2. Operate the access system to assure that all components of the system function normally
from the AC power source.
3. NORMAL OPERATION - Place the main AC input circuit breaker to the OFF position to
simulate a power interruption. The access system should remain in normal operation with
no disruption in service. Operate the access system to assure that all components are
operating normally. This includes the vehicular gate operator(s), loop detectors,
telephone entry system, card readers, keypads, RF access control, emergency vehicle
entry devices, etc.
4. QUICK OPEN OPERATION - Place the main AC input circuit breaker to the OFF position
to simulate a power interruption. Each of the gate operators connected to the Backup
Power System will sequentially open in 30-second intervals and should remain open.
5. Place the main AC input circuit breaker to the ON position. After approximately 40
seconds, the system will return to operating from the main AC power source. (If quick
open operation was selected, each gate operator will be given a reset command so that it
can resume normal operation).