2.2 High Voltage Terminal Connection
Remove the
3 locknuts
inside the
electronic
box to swing
box open.
Route incoming AC power wire through the high voltage conduit and run wire in the operator electronic box as shown.
Be sure wiring is installed in accordance with local codes. Be sure to color code all wiring.
It is recommended that a surge suppressor be installed on the high voltage power lines to help protect the operator
and circuit board from surges and power fluctuations.
Dual operators (Primary/Secondary) require AC power to EACH operator.
High
Voltage
Input Wire
DANGER
HIGH VOLTAGE!
DO NOT power up and cycle the operator until the
DIP-Switches” and the “Limit Switches” have been
adjusted. Damage could occur to the gate and operator.
1
2
3
AC Power AC Power
Dual Operators
Electronic Box
CAUTION
High Voltage AC input power
MUST MATCH the operator
specifications or DAMAGE will
occur and VOID the warranty!
A separate power disconnect switch may
be needed in your area. Check local
building codes before installation.
Recommended by DoorKing.
External Power
Disconnect Switch
208/230 VAC
SINGLE Phase
Chassis
Ground
High Voltage
AC Input Wire
Hot
115 VAC Output
Hot
Use only two legs of the
incoming 3-phase power.
208/230/
460 VAC
THREE Phase
Chassis
Ground
High Voltage
AC Input Wire
Hot
115 VAC Output
Hot Hot
Check polarity of
three phase motor.
See page 20.