6.3 Commissioning procedure
Commissioning
The device is put into operation in 5 work steps:
1 Planning the system in partner application
2 Adding setup medium in partner application
3 Connecting the device to the power supply
4 Configuring the Ethernet interface using Service Tool, if required
5 Connecting at least one registration unit to the device
6 Putting the device into operation by means of the setup medium via a registra-
tion unit
6.3.1 Planning the system in partner application
Before putting the device into operation, at least the door to be connected must be
planned in the partner application. The device is configured by assigning its installa-
tion site and the additional hardware components in this software.
For information on the planning of the system, see online help of the parter applica-
tion.
6.3.2 Registering the setup medium in partner application
After the system has been planned in the partner application, a setup medium for
this system - also in the partner application - must be registered. This setup medium
is then used for commissioning the individual components used for the system , i.e.
for connecting them to the Internet platform.
A setup medium is a card with a code which must be activated in the partner appli-
cation for the corresponding system (add setup medium).
For information on the registration of a setup medium in the partner application, re-
fer to the online help of the partner application.