Installation Manual

4
Proper Cable Management to Enclosure
Avoid common Installation Mistakes
Always Create a Drip Loop for all Cables or Conduit Entering
Dotworkz D2 Housing from level or Above D2
Conduit, Power, Data, & Antennae
To avoid gravity driven moisture entry into Enclosure
To properly seal, Dotworkz Cable Gland Strain Relief Ports will only accept One single round cable per port
NO
Romex
Flat Cable
* SJOOW
* Cat5/ Cat6
* Coaxial
+
=
Dotworkz Standard Cable Gland Port
Seals are designed for ONE single round
cable only per port
Use Round Cable Only with
provide Cable Gland Port Seal
Only Use Qualified Installation or Service Technician for Installing & Servicing Dotworkz Enclosures.
Power Must be disconnected and kept off while installing or Servicing Enclosure.
Follow All Local and Applicable Electrical Codes and Standards for Installation of Electrical components.
All Cable Ports, wire feeds, or Conduit must be fully sealed to eliminate moisture within Enclosure.
All Dotworkz Enclosures are required to be fully sealed before placing into service, to protect integrated products, to
eliminate any moisture driven shock hazard, to perform optimally as designed.
DRIP LOOPS
Cable can be multi-conductor in single round cable bundle such as Cat5/ 6e (burial rated), or Conductor cable SJ00W (water rated)
Cable Gland Strain Relief Port Seals
Conduit
+
If Conduit is used in Lieu of Cable Gland Port Seals provided,
Then Use Only Liquid Tight Conduit & fittings properly sealed.
Internal Wire feeds must be fully sealed prior to placing Enclosure into Service.
See Conduit Guidelines section of this manual.