Installation Guide

Figure 2-1: Attaching First Half of Expandable Struts to Pole Channel
Step 2: Attaching First Half of Expandable Struts to Lower
Pole Channel
The Expandable Struts are attached to the ends of the lower Pole Channel using
3/8 x 1 hex bolts and hardware. The Struts are attached/assembled in two stages
with one half installed here and second half installed in Step 4.(See Figure 2-1)
A. Orient and align the Struts as shown in Figure 2-1. Secure with one 3/8 x 1
hex bolt, lock washer, flat washers, and Hex Nut, and finger tighten for now.
"
""
"
Figure 3-1: Attaching Rails to Pole Channel
Step 3: Attaching Module Rails to Upper Pole Channel
The two Module Rails are attached to the ends of the upper Pole Channel using 3/8
x 1 hex bolts and hardware. (See Figure 3-1)
A. Orient and align the left Module Rail as shown in Figure 3-1. Secure with
one 3/8 x 1 hex bolt, lock washer, flat washers, and Hex Nut. Finger
tighten for now.
B. Continue in this manner to install the right Module Rail, and finger tighten
for now.
"
"
""
7 of 10
3/8
Hex
Nut
"
3/8 x 1
Hex Bolt
""
Expandable Strut
(one of two parts)
Expandable
Strut (one of
two parts)
Lock
Washer
Flat
Washers
Lower Pole Channel
3/8
Hex
Nut
"
3/8 x 1
Hex Bolt
""
Rail (Right)
Rail (Left)
Lock
Washer
Flat
Washers
Upper Pole Channel
Assembly Instructions, Side-of-Pole Mount for 2 Modules (SPM2) For Module Types E, F, G, & H (Version 1, Rev A)