Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation YOUR DPW SOLAR DISTRIBUTOR SOLARIS 720-474-6050 www.solaris-shop.
Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G A few words about the product The TPM1 for module types A, B, C, D, E, F, & G is designed to mount on 2 inch SCH40/80 galvanized steel pipe (installer supplied). Pipe size and foundation requirements are based on several factors including the array surface area, maximum design wind speed, exposure category, soil type, steepest expected tilt angle, and above-ground clearance.
4 5 6 7 Top-of-Pole Mount for 1 Module for Module Types A, B, C, D, E, F, & G Parts Identification 3 2 1 Assembly Instructions, Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G (Version 2, Rev D) 2 of 7
Step 1: Install the Mounting Sleeve on Vertical Pipe CAUTION: Use care while working around the structure during assembly. There could be components that create hazards or obstruct free movement, causing serious bodily injury. Many of these are at head/eye level. Move slowly and with care around the work area. Before installing the Mounting Sleeve, verify that the Mounting Pole is plumb to the ground and hasn't shifted or leaned while the concrete footing has cured.
CAUTION: This is a two person activity. The Strongback must be held in place by one person while the second person aligns it and secures it to the Mounting Sleeve using the Pivot Bolt and the 5/16” Anchor Bolt. Failure to do so could lead to serious personal injury.
WRONG CORRECT Visible Gap Strongback Pivot Bolt Lock Bolt No Gap Strongback Vertical Tower Vertical Tower Visible Gap No Gap Figure 2-3: Tighten and Torque the Pivot Bolt Step 3: Attach the Module Rails to the Support Angles CAUTION: This is a two person activity. Module Rails are unstable before they are fully secured to the Support Angles. Module Rails must be held in place by one person while the second person aligns and secures them to the Support Angles.
CAUTION: This is a two person activity. PV Modules are heavy and unstable before they are fully secured to the Module Rails. PV Modules must be held in place by one person while the second person aligns and secures them to the Module Rails. Failure to do so could lead to serious personal injury and damaged components. Step 4: Installing PV Modules to Module Rails PV Modules are secured to the Module Rails using 1/4” x 3/4” bolts and hardware. A. Place the PV Module on the Module Rails.
CAUTION: Do not attempt to remove the Pivot Bolt during tilt adjustments. Removal could lead to serious personal injury or death. Adjustments are made with the Pivot Bolt hardware loosened but in place. CAUTION: This is a two person activity. As the Pivot Bolt is loosened and the 5/16” hardware is removed, the rack is heavy and unstable. It must be held in place by one person while the second person loosens and removes the hardware and then re-installs/tightens the hardware back in place.
Direct Power & Water Corporation 4000-B Vassar Drive NE Albuquerque, New Mexico 87107 USA Preformed Line Products (Canada) Limited 1711 Bishop St. E Cambridge, ON N1T 1N5 Telephone: 800.260.3792 Fax: 505.889.3548 Web Site: www.DPWSolar.com E-mail: info@power-fab.com Telephone: 519.740.6666 Fax: 519.740.7917 Web Site: www.preformed.on.ca E-mail: sales@preformed.on.