Installation Manual
INSTALLATION INSTRUCTIONS
Product No.
26102
PLYMOUTH, MI.
DUAL CAM HIGH-PERFORMANCE
SWAY CONTROL
ASSEMBLY:
1. Remove small U-bolt and chain from spring bar if needed. Put the U-bolt in the last chain link, and insert U-bolt ends
through two holes in hanger bracket as shown above. Secure with two lock nuts. Make sure that at least two threads
are showing past the ends of the nuts, pinch the chain if necessary.
2. Adjust Cam Arm Assembly such that the Cam Arm Yoke is approximately centered on the the Cam Arm threads.
Hold position by tightening nuts with finger pressure.
DUAL CAM HIGH-PERFORMANCE SWAY CONTROL PROPERLY INSTALLED
(USE ONLY WITH HIGH-PERFORMANCE WEIGHT DISTRIBUTION OR SPRING BARS WITH INTEGRATED CAM, SEE PAGE 2)
DUAL CAM HIGH-PERFORMANCE SWAY CONTROL COMPONENTS
SET BOLT
1/2-13 X 3.5”
SQUARE HEAD
BOLT
SMALL U- BOLT
INSIDE VIEW OF TRAILER FRAME
HANGER BRACKET
JAM NUT
1/2-13
Flanged head thread
forming screw for
tubular frames
Cap screw, nuts and
lock washers for c-
channel frames
Approximately equal
amount of threads on
either side of yoke.
SPRING BAR & TRUNNION
HANGER BRACKET
BALLMOUNT
FRAME PLATE
CAM ARM YOKE
SNAP-UP
BRACKET
CAM ARM
26102N-10-15-04A PCN7377 ©2004 TOWING PRODUCTS, INC Litho in USA