Installation & Assembly

Lift Gate Panel up
to open
9.
To open the gate: Slide the Gate Release Switch (9A). Lift the Gate Panel upward (9B).
Gate open in both directions (9C).
9B
Gate Release
Switch
Slide
9A
Gate opens in
both directions
9C
Gate
Panel
Lower
Locking Set
Gate Frame
10A 10B
OPERATION
7
10.
Close the gate until it is fully locked with Upper (10A) and Lower Locking sets (10B) engaged.
Lower
Lock
Rod
Upper
Locking Set