Installation Guide

UNIDOOR PLUS (STYLE F) manual Ver.1 Rev 5 09/2016
5
Preparation
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece
count with your packing slip. After opening all boxes and packages read this introduction carefully.
Check that all of the needed parts are included in the package by checking off the components on
the “Detailed Diagram of Shower Door Components”. If the unit has been damaged, has a
finishing defect, or has missing parts, please contact our customer support department within
3 business days of the delivery date. Please note that DreamLine
®
will not replace any
damaged products or missing parts free of charge after 3 business days or if the product has
been installed. Feel free to contact DreamLine
®
if you have any questions, and please provide an
order number, job name or other proof of purchase to help us identify your original order.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine
®
is not responsible for code compliance standards for your project and will not accept any
returns.
3. If this unit is going to be installed in new construction, please install all of the required plumbing
and drainage before installing the shower. Use a competent and licensed (if required by local
code) plumber for all plumbing installation.
4. Prior to the installation, please ensure that the installation surface is level and solid and will be
able to support the total weight of the unit. Also make sure that the walls are plumb. Depending
on the type of unit you are installing, some adjustments in leveling may be possible. However,
irregular installation, surface level or out of square conditions can result in serious problems for
your installation. Please note that some adjustments and drilling may be necessary. Please protect
all primary surfaces of the product during installation. Never set your glass down directly onto a
tile floor. Always use a piece of wood or cardboard to protect the bottom edge and corners of the
glass.
5. Note: The installation of this unit requires that you drill down into the threshold.
6. This model requires a minimum 5/8” of flat threshold space for installation.
7. This model has 1/2” of adjustment within the u-channel on the stationary panel side for
out-of-plumb wall conditions and overall width within the model size. Confirm the finished
opening conditions before proceeding with the installation.
8. Professional installation recommended.
NOTE: This model is reversible for left or right hand installation. This manual will show the right
side panel installation. For a left side panel installation, simply begin on the opposite wall and
reverse the orientation of the parts as necessary.
©2017 DreamLine. All Rights Reserved