Prism Shower Enclosure & Base SHOWER ENCLOSURE & BASE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model’s web page on DreamLine.
©2018 DreamLine. All Rights Reserved SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT! DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model’s web page on DreamLine.
©2018 DreamLine. All Rights Reserved Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine. All Rights Reserved Shower Base Installation - Preparation 1. Ensure that the floor and the studs are at right angles. Provide a 5”×5” opening in the subfloor for the drain. The 2” PVC waste pipe should extend above the surface of the sub-floor according to the drain installation instructions and the height of the Shower base. Refer to the product drawings and tables in this installation manual for the drain location. 90° 90° 90° See Fig. 1 and Fig. 2 for details.
©2018 DreamLine. All Rights Reserved 2. Install the shower drain (NOT INCLUDED) according to the drain installation manual (supplied with the drain). See Fig. 3 for example Fig. 3 3. Place the tray into the designated position so that the Drain cutout drops around the Drain Pipe and butt the Shower Base up against the studs. See Fig. 4 for details. Lower the base over the drain pipe and set it into place against the studs. Fig.
©2018 DreamLine. All Rights Reserved 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See Fig. 5 for details. Level base in two directions Fig. 5 5. Mix the bedding material (Mortar, cement-sand mix, etc.) Concrete or plaster is not recommended. Apply enough bedding material to support the entire bottom of the shower base. This will add additional stability and prevent the base from shifting position. See Fig. 6 for details. Mortar Fig.
©2018 DreamLine. All Rights Reserved 6. After the bedding material has been poured and before it sets, place the shower base into the position with the drain assembly sliding over the PVC waste pipe. It will be necessary to push the shower base until the top of the tile flange aligns with the marks drawn on the studs and the front edge is contacting the rough floor along the entire length of the shower base. Ensure that the base is level in all directions.
©2018 DreamLine. All Rights Reserved Fig.
©2018 DreamLine. All Rights Reserved Product Maintenance BASES and BACKWALLS: To ensure long lasting life for your acrylic base and/or back walls: wipe them off after each use with a soft cloth. To clean the acrylic base or back walls use non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
TEL: 866-731-2244 FAX: 866-857-3638 DREAMLINE.COM For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.
PRISM SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to your model’s web page on BathAuthority.com Model #s SHEN-2134340-01, 04 SHEN-2136360-01, 04 SHEN-2138380-01, 04 SHEN-2140400-01, 04 Finish 01= Chrome 04= Brushed Nickel Please read these instructions carefully before installing.
Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
Tools Required Caulk Tape Measure Level “PRISM” Ver.1 Rev.
Detailed Diagram of Shower Enclosure Components 8 2 1 9 10 4 11 5 3 12 13 14 6 15 16 7 17 18 19 Packing List 01 02 03 04 05 06 07 08 09 10 Glass profile Wall profile Stationary glass Glass door Pivot bar Handle Pivot assembly Wall anchor Decorative cover Round head screw ST4.2×10 2pcs 2pcs 2pcs 1pc 2pcs 1pc 2sets 8pcs 4pcs 4pcs 11 12 13 14 15 16 17 18 19 Round head screw ST4.
Shower Enclosure Installation 1. Draw the line on the wall according to your Shower Enclosure model size. Place the Wall profiles (02) onto the Shower base or threshold against the finished wall and level it vertically. W1 W2 See Fig. 1 for details. Enclosure assembly measurements: Measure from the finished corner to the inside edge of wall profile as shown: Model No.
3. Apply clear silicone along the inner channel of the Glass profile (01) and push the Stationary glass (03) inside the channel. Slide the Stationary glass assembly into the groove of the Wall profile (02). NOTE: The small holes on the Stationary glass should be away from the wall. 1 4 2 5 3 6 NOTE: If you have difficulty sliding the Glass profile over the Stationary glass, you can slightly tap on the Glass profile with a rubber mallet and a piece of wood.
Fig. 5 5. Attach top and bottom Pivot bars (05) to the Stationary glass (03) using clear Vinyl gaskets (15), Decorative washers (18) and Hex socket bolts M8×25 (17). Place the clear Vinyl gasket between the Pivot bar and the Stationary glass to prevent glass to metal connection. Place the Decorative washer between the Hex socket bolts M8×25 and the Stationary glass. See Fig. 6 and Fig. 7 for details. 1 2 Fig. 6 “PRISM” Ver.1 Rev.
Fig. 7 6. After final adjustments of both Stationary glasses (03), drill the holes, on each end, through the predrilled holes in the Wall profiles (02) into the first layer of the Glass profiles (01) using Ø 1/8” drill bit. Use the Round head screws ST4.2×10 (10) to secure the Glass profiles inside the Wall profiles. Cover the exposed screw heads with Decorative covers (09). 4 1 5 See Fig. 8 for details. 2 3 Fig. 8 “PRISM” Ver.1 Rev.
7. Mount top and bottom Pivot assemblies (07) to the Pivot bars (05) using Hex socket bolts M8×12 (16). Remove the back fastener from the Pivot assemblies. Set the Glass door (04) so the holes are aligned. Make sure the vinyl gaskets are in between the glass and the metal parts. Secure the back fastener with the provided bolt. 3 1 See Fig. 9 for details. 2 Fig. 9 8. Push the Flanged anti-water strip (14) to the vertical edge of the Glass door (04) to seal between the door and the Stationary glass (03).
9. Apply a bead of Kitchen & Bath Waterproof silicone along the interior edges of the Stationary glass (03), Wall profiles (02) and Pivot bar (05) to seal against the walls and threshold. See Fig. 11 for details. Fig. 11 Product Maintenance BASES and BACKWALLS: To ensure a long life for your acrylic back walls: wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners.
TEL: 866-731-2244 FAX: 866-857-3638 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Enclosures please visit www.BathAuthority.