Installation Guide

“PRISM” Ver.1 Rev.3 08/2015
2
Preparation
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece
count with your packing slip. After opening all boxes and packages read this introduction carefully.
Check that all of the needed parts are included in the package by checking off the components on
the “Detailed Diagram of Shower Door Components”. If the unit has been damaged, has a
finishing defect, or has missing parts, please contact our customer support department within
3 business days of the delivery date. Please note that DreamLine
TM
will not replace any
damaged products or missing parts free of charge after 3 business days or if the product has
been installed. Feel free to contact DreamLine
TM
if you have any questions, and please provide an
order number, job name or other proof of purchase to help us identify your original order.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine is
not responsible for code compliance standards for your project and will not accept any
returns.
3. Please ensure that prior to the installation the installation surface is leveled and solid and will be
able to support the total weight of the unit. Also make sure the walls are at right angles. Irregular
installation surface level or improper angle of side walls will result in serious problems for your
installation. Please, note that some adjustments and drilling might be necessary during the
installation process.
4. This unit has to be installed against a finished floor and walls.
5. Please, NOTE! This door has 3/8” out-of-plumb adjustment on each side. Make sure your
walls are at right angles.
NOTE: This model is reversible for left or right hand installation. This manual will show the left hand
installation with the door pivots on the right. For a right hand installation, simply reverse the
orientation of the parts as necessary.