Installation Guide

© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
Tools Needed
INFINITY-Z Shower and Tub Door Manual Ver 5 Rev 2 012020 14
©2020 DreamLine® All Rights Reserved
2
NOTE
At this step, decide on the handing of the door and panel
prior to placing the assembly into the opening to mark the
location of the holes for drilling. Flip the assembly so that the
Inline Panel Glass (#06) will be installed on the desired side
of the opening.
Before marking the holes for drilling,
confirm the assembled frame is tight to
the threshold, the Wall Profiles(#02)
are tight to the walls and the frame is
level and plumb.
Fig 6
1
NOTE
±
0
.0
±
0
.0
6