Installation Sheet

Preparation
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece
count with the packing slip. After opening all boxes and packages read this introduction carefully.
Check that all of the necessary parts are included in the package by checking off the components on
the “Detailed Diagram of Shower Door Components”. If the unit has been damaged, has a finishing
defect, or has missing parts, please contact our customer support department within 3 business days
of the delivery date. Please note that DreamLine
®
will not replace any damaged products or
missing parts free of charge after 3 business days or if the product has been installed. Contact
DreamLine
®
if you have any questions, and please provide an order number, job name or other proof of
purchase to help identify the original order.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine
®
is not
responsible for code compliance standards for your project and will not accept any returns.
3. If this unit is going to be installed in a new construction, please install all of the required plumbing
and drainage before installing the shower. Use a competent and licensed (if required by local code)
plumber for all plumbing installation.
4. Please make sure that prior to beginning the installation, the surfaces are leveled and solid and will
be able to support the total weight of the unit. Also make sure the walls are at right angles. Irregular
installation surface level, radius corners or improper angle of side walls will result in serious problems
for your installation. Note that some adjustments and drilling will be necessary during the installation
process.
5. Please protect all primary surfaces of the product during installation. Never set the glass down
directly onto a tile floor. Leave corner protectors in place until necessary to remove them. Always use a
piece of wood or cardboard to protect the bottom edge and corners of the glass prior to and during
installation.
6. This unit must be installed upon a finished threshold and against finished walls.
7. This model has 1” of adjustment per wall profile for out-of-plumb wall conditions and overall width
within the model size. Confirm the finished opening conditions before proceeding with the installation.
8. This model requires a minumum of 1” of flat threshold space for installation.
9. Professional installation recommended.
NOTE: This manual will describe the shower door installation. Please follow the same sequence of
installation steps for the tub door installation.
NOTE: This door is reversible for right or left-hand door installation. The right-hand door
installation is shown as an example throughout this manual. For the left–hand door installation,
flip the assembly top to bottom so that the panel is on the right side (see Step #9).
NOTE: For models with frosted glass: the textured surface must face the outside of the shower.
©2017 DreamLine. All Rights Reserved
2INFINITY-Z manual Ver 4 Rev 5 06/2017
!