Installation Guide

“INFINITY-Z” Rev.2 Ver.4 08/2013
9
11. Attach the Towel bar (18) to the Stationary
glass (05).
NOTE: Towel bar must be installed on the
outside of the stationary glass.
See Fig. 11 for details.
Fig. 11
NOTE: Glass Door (04) may come with the
Wheel assemblies (17) preinstalled. If not,
please refer to (Fig. 12) for detailed
installation.
12. Fasten the top and the bottom Wheel
assemblies (17) to the Glass door (04). The
top wheels can adjust the door level with the
adjustable bolt and lock nut. The bottom wheel
has a press button to fix the wheel on to the
bottom Guide rail (03).
Note:
The lock nut of the upper wheel and the press
button of the bottom wheel should be pointing
up.
See Fig. 12 for details.
Fig. 12
2
1
2
1
3
4
5
6