Mirage Shower Door & Base Kit SHOWER Door AND SHOWER BASE KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to the support.BathAuthority.com web page.
MIRAGE SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to the support.BathAuthority.com web page. Please read these instructions carefully before installing.
Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the package by marking all the components on the “Detailed Diagram of Shower Door Components”. Examine boxes and packages for shipping damage. If the unit has been damaged, has a finishing defect, or is missing parts, please contact our customer support department within 5 business days of the delivery date.
Detailed Diagram of Shower Door Components 6 1 5 7 8 2 9 10 11 12 4 13 14 3 15 16 Parts List 01 02 03 04 05 06 07 08 Stationary glass Glass door Guide rail Handle Support bar Wall anchor Round head screw ST4.2×55 Guide rail connector 1pc 1pc 1pc 1pc 1pc 6pcs 5pcs 1pair 09 10 11 12 13 14 15 16 Sliding bracket assembly Roller assembly Stopper block Wall bracket Single side strip Bumper strip Seal gasket Countersunk screw ST4.
Sliding Bracket Assembly A D E F B C G H I J A B C D E Face Plate Back Plate Slider 1/16” PVC gasket 1/16” PVC washer “MIRAGE - 48” Rev. 2 Ver.
Shower/Tub Door Installation NOTE: The installation of this door requires two installers. NOTE: The door can be installed on the shower base, tub or custom threshold. 1. Measure the distance between two walls. This distance is marked as “W”. See Fig. 1 for details. W Fig. 1 2. Your Guide rail (03) has been precut for your Shower model opening width: 48” or 60” for shower width.
3. Fasten the Guide rail connector (08) to one of the sides of the Guide rail (03). Slide in two Roller assemblies (10) from the other end of the Guide rail. Fasten another Guide rail connector to the other side of the Guide rail. Position the Guide rail on base or threshold and trace through predrilled holes of Guide rail connector flange to mark wall. Drill the holes using Ø 5/16” drill bit and insert the Wall anchor (06). Apply a layer of waterproof silicone to the bottom side of the Guide rail.
5. Mount the Wall bracket (12) to Stationary glass (01). Slide the glass into the channel of the Guide rail (03). 1 See Fig. 5 for details. 2 3 Fig. 5 6. Butt up Stationary glass (01) against the wall and level it vertically. See Fig. 6 for details. Fig. 6 “MIRAGE - 48” Rev. 2 Ver.
7. Outline the position of the Wall bracket (12) on the wall. Set Stationary glass (01) aside. Remove the Wall bracket from Stationary glass and by replacing it to the outlined position mark the hole on the wall. Drill the hole using Ø 5/16” drill bit, insert the Wall anchor (06) and fasten the Wall bracket to the wall with the Round head screw ST4.2×55 (07). Put Stationary glass back into position and tight it up to the Wall Bracket. 1 4 2 5 3 6 See Fig. 7 for details. Ø 5/16” Fig. 7 1 8.
1 NOTE: Please refer to Sliding bracket assembly (09) diagram on Page 4. 9. Disassemble the Sliding bracket assembly. Mount the Face Plate (A) and Back Plate (B) on the top of Stationary glass A (01) with the Head screw M6×16 (G). Use PVC gasket (D) and PVC washer (E) in between glass and metal parts. NOTE: Use only hand tools. Do not over tighten the screws. 2 See Fig. 9 and Fig. 10 for details. Fig. 9 Fig. 10 “MIRAGE - 48” Rev. 2 Ver.
10. Install the Stopper block (11) on the bottom of the Glass door (02). 1 See fig. 11 for details. 2 Fig. 11 11. Bring the Glass door (02) inside the shower. Remove nuts from the Roller assembly (10) bolts and spread the rollers against the installation holes on the Glass door. Fasten the Roller assembly to the Glass door through the predrilled holes. NOTE: Steps 11 and Steps 12 require second person to hold Glass door. The Glass door will not stay by itself until you finish the Step 12.
NOTE: Please refer to Sliding bracket assembly (09) diagram on Page 4. 12. Place the Slider (C) over the top edge of the Glass door (02) and put the Sliding bracket assembly together using Head screw M4 ×10 (F). 1 NOTE: Sliding bracket assembly (09) can be installed for either left or right hand configurations. These directions are written for right-hand configuration; See Page 14 for left hand configuration. See Fig. 13 and Fig. 14 for details. 2 3 Fig. 13 Fig. 14 “MIRAGE - 48” Rev. 2 Ver.
. Press the Bumper strip (14) on the vertical edge of the Glass door (02). Push the Seal gasket (15) into the channel of the Guide rail (03). 1 See Fig. 15 for details. 2 Fig. 15 14. Install the Handle (04) onto the Glass door (02). See fig. 16 for details. Fig. 16 “MIRAGE - 48” Rev. 2 Ver.
15. Locate the Support bar (05) and temporarily fasten it to the Sliding bracket assembly (09) with the Head screw M6×8 (H). Adjust the bar to a proper position and level it horizontally. Hold it firmly and outline the wall bracket of the Support bar to mark wall with position. Remove the Support bar and detach its wall bracket. Place the wall bracket of the Support bar against its outlined position on the wall and mark the hole for drilling.
NOTICE: The above installation steps are given for the right-hand configuration. For left-hand configuration door, please reverse Stationary glass. See Fig. 19 for details. Fig. 19 Product Maintenance To ensure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to your model’s web page on BathAuthority.com Please read these instructions carefully before installing.
Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
SINGLE THRESHOLD SHOWER BASE Center Drain Configuration W W1 11 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1132320 DLT-1136360 32"×32" 36"×36" 32" 36" 32" 36" 15" 15" 16" 18" DLT-1134420 34” x 42” 34” 42” 15” 21” DLT-1132480 DLT-1136480 DLT-1130600 DLT-1132600 DLT-1134600 DLT-1136600 32"×48" 36"×48" 30"×60" 32"×60" 34"×60" 36"×60" 32” 36" 30" 32" 34" 36" 48” 48" 60" 60" 60" 60" 15” 15" 15" 15" 15" 15" 24” 24" 30" 30" 30" 30" “SLIMLINE SHOWER BASE” Ver.5 Rev.
SINGLE THRESHOLD SHOWER BASE Left-Hand Drain Configuration W W1 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1130601 DLT-1132601 DLT-1134601 DLT-1136601 30"×60" 32"×60" 34"×60" 36"×60" 30" 32" 34" 36" 60" 60" 60" 60" 15" 15" 17" 18" 12" 12" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
SINGLE THRESHOLD SHOWER BASE Right-Hand Drain Configuration W W1 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1130602 DLT-1132602 DLT-1134602 DLT-1136602 30"×60" 32"×60" 34"×60" 36"×60" 30" 32" 34" 36" 60" 60" 60" 60" 15" 15" 17" 18" 12" 12" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
NEO ANGLE SHOWER BASE W C C A W B A MODEL SPECIFICATION W (in) A (in) B (in) C (in) DLT-2036360 DLT-2038380 DLT-2040400 DLT-2042420 36"×36" 38"×38" 40"×40" 42"×42" 36" 38" 40" 42" 18 5/16" 20 5/16" 22 5/16" 24 5/16" 25" 25" 25" 25" 12" 12" 14 3/8" 14 3/8" “SLIMLINE SHOWER BASE” Ver.5 Rev.
QUARTER ROUND SHOWER BASE W C C W R MODEL SPECIFICATION W (in) C (in) R (in) DLT-7033330 DLT-7036360 DLT-7038380 33"×33" 36"×36" 38"×38" 33" 36" 38" 12" 12" 12" 21 5/8" 21 5/8" 21 5/8" “SLIMLINE SHOWER BASE” Ver.5 Rev.
DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration W C C W MODEL SPECIFICATION W (in) C (in) DLT-1032320 DLT-1036360 32"×32" 36"×36" 32" 36" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
DOUBLE THRESHOLD SHOWER BASE Left-Hand Drain Configuration W W1 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1034481 DLT-1036481 DLT-1036601 34"×48" 36"×48" 36"×60" 34" 36" 36" 48" 48" 60" 17" 18" 18" 12" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
DOUBLE THRESHOLD SHOWER BASE Right-Hand Drain Configuration W W1 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1034482 DLT-1036482 DLT-1036602 34"×48" 36"×48" 36"×60" 34" 36" 36" 48" 48" 60" 17" 18" 18" 12" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
Shower Base Cross Section Diagram Shower Base Cement board Finished Wall (2"×4") Stud Mortar Drain “SLIMLINE SHOWER BASE” Ver.5 Rev.
Shower Base Installation - Preparation 1. Ensure that the floor and the studs are at right angles. Provide a 5”×5” opening in the subfloor for the drain. The 2” PVC waste pipe should extend above the surface of the sub-floor according to the drain installation instructions and the height of the Shower base. Refer to the product drawings and tables in these installation instructions for the drain location. 90° 90° 90° See Fig. 1 and Fig. 2 for details.
2. Install the shower drain (NOT INCLUDED) according to the drain installation manual (supplied with the drain). See Fig. 3 for example Fig. 3 3. Place the tray into the designated position so that the Drain Body drops around the Drain Pipe and butt the Shower Base up against the studs. See Fig. 4 for details. Lower the base over the drain pipe and set it into place against the studs. Fig. 4 “SLIMLINE SHOWER BASE” Ver.5 Rev.
4. Level the tray and place marks on the studs above the upper edge of the tile flange. See Fig. 5 for details. Level base in two directions Fig. 5 5. Mix the bedding material (Mortar, cement-sand mix, etc.) Concrete or plaster is not recommended. Apply enough bedding material to support the entire bottom of the shower base. This will add additional stability and prevent the base from shifting position. See Fig. 6 for details. Mortar Fig. 6 “SLIMLINE SHOWER BASE” Ver.5 Rev.
6. After the bedding material has been poured and before it sets, place the shower base into the position with the drain assembly sliding over the PVC waste pipe. It will be necessary to push the shower base until the top of the tile flange aligns with the marks drawn on the studs and the front edge is contacting the rough floor along the entire length of the shower base. Ensure that the base is level in all directions.
Fig. 9 Product maintenance To ensure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface. To ensure long lasting life for your glass shower products, wipe them off after each use with a soft cloth. Rinse and wipe of the glass using either soft cloth or squeegee to prevent soap buildup.
DREAMLINE™ EXCLUSIVE LIMITED WARRANTY AS OF MAY 6, 2013 This warranty extends only to the original owner/end‐user for household use only and is not transferable to a subsequent owner. This warranty extends for a designated period of time, so long as it remains in use in its original place of installation. This warranty applies only to DreamLine products purchased from an authorized dealer in United States or Canada.
TEL: 866-731-2244 FAX: 866-857-3638 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Bases please visit www.BathAuthority.