Installation Guide

© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
7ENCORE shower and tub door manual Ver 1 Rev 5 05/2018
©2018 DreamLine. All Rights Reserved
Note: The bottom guide rail fits between
the wall profiles.
Use the wall profiles to leave the proper
spacing for their installation in a later step.
Fig 3a
Fig 3b
!
center
3. Place the Bottom Guide Rail (#15) onto the threshold in the desired position. Use a tape measure
to align the Bottom Guide Rail (#15) parallel with the front edge of the threshold and mark its
position. (Fig 3a)
TIP: Use the left and right Wall Profiles (#01) to center the Bottom Guide Rail (#15) on the
threshold to maintain the proper spacing from the walls. (Fig 3b)