Installation Guide

© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
8ENCORE shower and tub door manual Ver 1 Rev 5 05/2018
©2018 DreamLine. All Rights Reserved
Fig 4b
1
3 42
Ø5/16”
(8mm)
Fig 4a
TIP: Add a few drops of
dish soap to the screws to
make installation easier.
4. Attach the Upper Guide Rail Connectors (#07) to one end of both Wall Profiles (#01) using the
ST4.2 x 30 Truss Head Screws (#13). (Fig 4a)
Position one Wall Profile (#01) against the wall tight to the threshold and over the Bottom Guide
Rail (#15). Check for plumb with a level and mark the position. Mark both holes for drilling on the wall
through the holes in the Upper Guide Rail Connector (#07). (Fig 4b)
Remove the wall profile and drill Ø5/16” holes and insert the Wall Anchors (#09). (Fig 4a and 4b)