Installation Guide

© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
9ENCORE shower and tub door manual Ver 1 Rev 5 05/2018
©2018 DreamLine. All Rights Reserved
Fig 5b
Fig 5a
1
2
!
Painter’s Tape
TIP: Secure the wall profile to the wall with several
strips of painter’s tape or similar to hold it tight in
position until the silicone cures.
5. Apply silicone to the back of the Wall Profile (#01)
and place it back onto the marked position on the wall.
Attach the Upper Guide Rail Connector (#07) to the
wall using two each of the ST4.2 x 40 Countersunk
Flathead Screws (#10).
Attach two of the Wall Profile Bumpers (#04) using
the ST4.2 x 10 Screws (#11) and cover the holes with
the decorative caps. (Fig 5a and 5b)