Installation Instructions

“INFINITY Z” Rev.2 Ver.2 04/2013
2
Preparation
1. After opening all boxes and packages, read this introduction carefully. Check that all of the
needed parts are included in the package by marking all the components on the “Detailed
Diagram of Shower Door Components”. Examine boxes and packages for shipping damage.
If the unit has been damaged, has a finishing defect, or has missing parts, please contact
our customer support department within 5 business days of the delivery date. Please note
that DreamLine
TM
will not replace any damaged products or missing parts free of
charge after 5 business days or if the product has been installed. Feel free to contact
DreamLine
TM
if you have any questions.
2. Please note that you should consult your local building codes with questions on
installation compliance standards. Building and plumbing codes may vary by
location, and DreamLine is not responsible for code compliance standards for your
project and will not accept any returns.
3. Please ensure that prior to the installation the installation surface is leveled and solid and
will be able to support the total weight of the unit. Also make sure the walls are at right
angles. Irregular installation surface level or improper angle of side walls will result in
serious problems for your installation. Please, note that some adjustments and drilling
might be necessary during the installation process.
4. This unit has to be installed against a finished floor and walls.
PLEASE, NOTE!
This door does have 1” out-of-plumb adjustment on each side. Make sure your walls are vertical
and your shower base or threshold is leveled.
Note: If glass has silk, print or molded designs, please make sure that clear side faces inside
the shower.
Tools Required
Caulk
Tape
Measure Pencil
Screwdriver
Phillips
Level
Gun
Caulk
Drill
Electric
Hammer
Miter saw or Hacksaw
Drill bit
Drill bit
(Ø=5/16")
(Ø=1/8")