Duet Shower Door & Base SHOWER DOOR AND BASE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model’s web page on DreamLine.
©2018 DreamLine. All Rights Reserved SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT! DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model’s web page on DreamLine.
©2018 DreamLine. All Rights Reserved Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine. All Rights Reserved Shower Base Installation - Preparation 1. Ensure that the floor and the studs are at right angles. Provide a 5”×5” opening in the subfloor for the drain. The 2” PVC waste pipe should extend above the surface of the sub-floor according to the drain installation instructions and the height of the Shower base. Refer to the product drawings and tables in this installation manual for the drain location. 90° 90° 90° See Fig. 1 and Fig. 2 for details.
©2018 DreamLine. All Rights Reserved 2. Install the shower drain (NOT INCLUDED) according to the drain installation manual (supplied with the drain). See Fig. 3 for example Fig. 3 3. Place the tray into the designated position so that the Drain cutout drops around the Drain Pipe and butt the Shower Base up against the studs. See Fig. 4 for details. Lower the base over the drain pipe and set it into place against the studs. Fig.
©2018 DreamLine. All Rights Reserved 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See Fig. 5 for details. Level base in two directions Fig. 5 5. Mix the bedding material (Mortar, cement-sand mix, etc.) Concrete or plaster is not recommended. Apply enough bedding material to support the entire bottom of the shower base. This will add additional stability and prevent the base from shifting position. See Fig. 6 for details. Mortar Fig.
©2018 DreamLine. All Rights Reserved 6. After the bedding material has been poured and before it sets, place the shower base into the position with the drain assembly sliding over the PVC waste pipe. It will be necessary to push the shower base until the top of the tile flange aligns with the marks drawn on the studs and the front edge is contacting the rough floor along the entire length of the shower base. Ensure that the base is level in all directions.
©2018 DreamLine. All Rights Reserved Fig.
©2018 DreamLine. All Rights Reserved Product Maintenance BASES and BACKWALLS: To ensure long lasting life for your acrylic base and/or back walls: wipe them off after each use with a soft cloth. To clean the acrylic base or back walls use non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
TEL: 866-731-2244 FAX: 866-857-3638 DREAMLINE.COM For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.
DUET SHOWER DOOR/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model’s web page on DreamLine.com Model#: SHDR-1248728-## SHDR-1260728-## Model#: SHDR-1260588-## ## = finish: 01- Chrome / 04-Brushed Nickel ® For more information about DreamLine products please visit DreamLine.
DUET manual Ver.
Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
Tools Required Caulk Tape Measure Level DUET manual Ver.
Detailed Diagram of Shower Door/Tub Door Components 1 7 5 8 2 9 3 10 11 6 12 13 14 4 The glass surface with the ClearMax™ label must be installed to face inside of the shower 15 Packing List 01 02 03 04 05 06 07 08 Upper guide rail Wall profile Glass profile - 1 Left / 1 Right Bottom guide rail Glass door Handle Wall anchor Pan head screw ST4.2×16 1pc 2pcs 2pcs 1pc 2pcs 2pcs 8pcs 16pcs 09 10 11 12 13 14 15 Truss head screw ST4.
Shower Door Installation 1. Measure the distance between the two finished walls at the top (at unit height), middle and bottom. The wall profiles will adjust for out-of-plumb conditions. Use the smallest measurement as the finished dimension. See Fig. 1 for details. Top Middle Bottom W Fig. 1 The Upper guide rail (#01) and the Bottom guide rail (#04) have been pre-cut for your model width.
FINISHED OPENING - 2-1/4" = FINISHED CUT LENGTH "D" Upper Guide Rail "D" EQ CUT BOTTOM RAIL EQUALLY FROM BOTH ENDS "D" "D" Bottom Guide Rail EQ Fig. 2 3. Secure Upper guide rail (#01) and Bottom guide rail (#04) to the Glass profiles (#03) with the Truss head screws ST4.2×16 (#15). 1 3 1 3 inside inside See Fig. 3 and Fig. 4 for details. outside Note: There are 3 holes in the top end of the glass profiles.
Fig. 4 4. Push the Glass Profiles (#03) all the way over the Wall Profiles (#02). Make sure the Wall Profile flange faces inside the shower. 1 inside See Fig. 5 and Fig. 6 for details. 2 Fig. 5 DUET manual Ver.
Fig. 6 5. Move the assembled frame to the designated position and adjust the Wall profiles (#02) so that they are tight to the walls by slightly pulling them out of the Glass Profiles (#03) if necessary. NOTE: Use a level to check the wall profiles for plumb and vertical while marking the holes for drilling. See Fig. 7 for details. Fig. 7 DUET manual Ver.
1 6. Hold the frame in the correct position, mark the drill holes on the wall through the holes on the flange of the Wall Profile (#02). Set the assembled unit aside; drill the holes in the wall using a Ø5/16” drill bit and insert the Wall anchors (#07). 3 inside Ø 5/16” outside See Fig. 8 for details. 2 4 Fig. 8 7. Apply silicone to the back of the wall profiles, into the drilled holes and to the bottom of the bottom guide rail prior to attaching to the opening.
8. Secure the Rollers (#11) to the top of the Glass door (#05). Mind the direction of the rollers. (See Fig 10.1 and Figs 11- 13) Attach the Handle brackets (#12) to the Glass doors (A & B) using the 25mm machine head screws (screw bag #12). The handle brackets should face the same direction as the roller wheels. Then secure the Handles (#06) to the Handle brackets using Round head screw ST4.2×25 (screw bag #12) and cover the holes with the decorative bracket covers provided. (Fig 10.
B Fig. 12 9. From inside of the shower, install the outside Glass door (A) (#05) first, as shown in Fig 13.1 and 13.2. Then install the inside Glass door (B) (#05) making sure that the rollers are aligned in the Upper guide rail (#01) as shown. See Fig. 13 and Fig. 14 for details. 1 outside 3 inside B A 2 4 Fig. 13 DUET manual Ver.
Fig. 14 10. From inside the shower, slide both Glass Doors (#01) to the right. Place the Left guide block (#13) to the end of the guide rail and mark the drill hole in the Bottom Guide rail (#04) through the pre-drilled hole on the block using an Ø1/8” drill bit. Drill the hole and secure the Guide block with the Pan Head screw ST4.2×16 (08) using the washers and the Decorative Covers (10). See fig. 15 for details.
11. Fasten the Rubber stopper (#14) inside the groove of the Wall Profile (#02) using the Pan Head screw ST4.2×16 (#08). Repeat for all 6 of the Rubber stoppers (#14). 1 See Fig. 16 for details. 2 Fig. 16 12. Perform final adjustments of the Wall Profiles (#02) on the assembled unit making sure that the bottom rail is tight to the threshold. Drill Ø1/8" holes through the Glass profiles (#03) into the Wall profiles (#02) as shown in Fig 18.1 and attach them together using the Pan Head ST4.
13. After final adjustments of the Glass doors (#05), install the small black Pin Blocker that is packaged with the Rollers (#11). Insert the Pin Blockers all the way into the pre-drilled holes on the body of the Roller from the screw side as shown. This pin will prevent the doors from being lifted of the track, See Fig. 18 for details. Fig. 18 14.
Product Maintenance BASES and BACKWALLS: To ensure long lasting life for your acrylic back walls: wipe them off after each use with a soft cloth. To clean the acrylic back walls use nonabrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface. GLASS: To ensure long lasting life for your glass shower products: wipe them off after each use with a soft cloth.