Manual

© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
Preparation
!
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count
with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of
the needed parts are included in the package by checking off the components on the “Detailed Diagram of
Shower Door Components”. If the unit has been damaged, has a finishing defect, or has missing parts, please
contact our customer support department within 3 business days of the delivery date. Please note that
DreamLine
®
will not replace any damaged products or missing parts free of charge after 3 business
days or if the product has been installed. Feel free to contact DreamLine
®
if you have any questions, and
please provide an order number, job name or other proof of purchase to help us identify your original order.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine
®
is not
responsible for code compliance standards for your project and will not accept any returns.
3. If this unit is going to be installed in a new construction, please install all of the required plumbing and
drainage before installing the shower. Use a competent and licensed (if required by local code) plumber for
all plumbing installation
4. Please make sure that prior to beginning the installation, the surfaces are leveled and solid and will be able
to support the total weight of the unit. Also make sure the walls are at right angles. Irregular installation
surface level, radius corners or improper angle of side walls will result in serious problems for your
installation. Please, note that some adjustments and drilling might be necessary during the installation
process.
5. Please protect all primary surfaces of the product during installation. Never set your glass down directly
onto a tile floor. Leave corner protectors in place until necessary to remove them. Always use a piece of wood
or cardboard to protect the bottom edge and corners of the glass prior to and during installation.
6. This unit must be installed upon a finished threshold and against finished walls.
7. This model has 1/4” of adjustment for out-of-plumb wall conditions within the U-channels.
Verify that the walls are within this tolerance before proceeding with the installation.
8. This model requires that you drill into the threshold for proper installation. Contact the
manufacturer of the base or threshold material with any questions regarding the drilling of holes into
their product.
9. This model requires a minimum 1-1/2” of flat level threshold space for installation.
10. Professional installation recommended.
NOTE: This door is reversible for left or right-swing door installation. The left-swing door installation
is shown as an example throughout this manual. For the right-swing door installation, simply begin
on the opposite wall and reverse the orientation of the steps shown.
NOTE: DO NOT install the handle onto the door glass until instructed.
DO NOT lift the glass using the handle. This could result in damage to the glass and/or
serious personal injury. Always use an assistant or a professional grade glass suction cup
when handling heavy glass.
3PRISM PLUS with Buttress Shower enclosure manual Ver 1 10/2018
©2018 DreamLine. All Rights Reserved