Installation Guide

Preparation
1 21 2
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece
count with your packing slip. After opening all boxes and packages read this introduction carefully.
Check that all of the needed parts are included in the package by checking off the components on
the “Detailed Diagram of Shower Door Components”. If the unit has been damaged, has a finishing
defect, or has missing parts, please contact our customer support department within 3 business
days of the delivery date. Please note that DreamLine
®
will not replace any damaged products
or missing parts free of charge after 3 business days or if the product has been installed. Feel
free to contact DreamLine
TM
if you have any questions, and please provide an order number, job
name or other proof of purchase to help us identify your original order.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine
®
is
not responsible for code compliance standards for your project and will not accept any
returns.
3. If this unit is going to be installed in a new construction, please install all of the required plumbing
and drainage before installing the shower. Use a competent and licensed (if required by local
code) plumber for all plumbing installation.
4. Please make sure that prior to beginning the installation, the surfaces are leveled and solid and
will be able to support the total weight of the unit. Also make sure the walls are at right angles.
Irregular installation surface level, radius corners or improper angle of side walls will result in serious
problems for your installation. Please, note that some adjustments and drilling might be necessary
during the installation process.
5. Please protect all primary surfaces of the product during installation. Never set your glass down
directly onto a tile floor. Leave corner protectors in place until necessary to remove them. Always
use a piece of wood or cardboard to protect the bottom edge and corners of the glass prior to and
during installation.
6. This unit must be installed upon a finished threshold and against finished walls.
7. This model can accommodate up to 3/8“ per wall profile for out-of-plumb conditions.
Verify that the walls are plumb before proceeding with the installation.
8. This model requires that you drill into the threshold for proper installation.
9. This model requires a minimum 2-1/4” of flat threshold space for installation.
10. This model requires two people for installation.
11. Professional installation recommended.
NOTE: This manual will describe the shower door installation. Please follow the same sequence of
installation steps for the tub door installation.
3ENCORE / BRAVO Manual Ver 1 Rev 4 11/2016