Installation Guide
ENIGMA AIR manual Ver 1 Rev 5.2 02/2018
25
©2018 DreamLine. All Rights Reserved
1 2 3 4
door
door
panel
outside
panel
Fig 27
NOTE: Apply Thread Lock (#20)
to the Roller Guard bolt during
installation.
Fig 28
1 2
3
4
Guide Rail
Roller
1 /16"
Roller Guard
TIP: Position the roller guard 1/16”
below the guide rail, hold the roller
guard bolt with the Allen wrench and
tighten the interior post using the
small Allen wrench (Fig 27.2)
28. Attach the Handle (#15) to the Door Glass (#03). Attach the Anti-Water Strips (#13) to the edge
of the Stationary Panel Glass (#02) and to the Door Glass (#03). Attach the Bumper Seal Strip (#14)
to the handle side of the Door Glass (#03). (Fig 28)
27. Attach the two Roller Guards (#09) onto the door glass to secure
the door to the Upper Guide Rail (#04). Apply Thread Lock Adhesive
(#20) to the bolts. Leave no more than a 1/16” gap between the
Roller Guards (#09) and the Upper Guide Rail (#04). Tighten the
post and screw on the cap. (Fig 27)