CORNERVIEW / FRENCH CORNER SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. Please refer to the model’s web page on DreamLine.com for the latest technical drawings, installation manuals, warranty information or additional product details.
Table of Contents Section title Page # Preparation Tools 2 Detailed Diagram of Shower Door Components 4 Parts List & Shower Enclosure Plan view 5 Installation Steps 6-11 Product Maintenance 12 CORNERVIEW/FRENCH CORNER Shower Enclosure manual Ver 4 04/2018 3 ©2018 DreamLine.
Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with the packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the necessary parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
Tools Level Power Drill Tape Measure Phillips Screwdriver Pencil Soft Head Hammer Drill bit Ø5/16" (8mm) Carpenter’s Square Tip: Measure the finished opening before Razor Knife Drill bit Ø1/8" (3mm) 100% Silicone Top proceeding with the installation to be sure that the correct model size has been ordered. Threshold must be level. Middle Tip: Prior to installation, cover the Tip: Set screw gun clutch to low setting when installing screws and bolts to prevent stripping the heads.
Detailed Diagram of shower door components 5 6 1 2 3 7 3 2 4 8 9 10 ©2018 DreamLine.
Parts List Part# DESCRIPTION QTY Part# DESCRIPTION QTY 01 Wall profile 2pcs 07 Round head screw ST4.2x10 4pcs 02 Stationary glass assembly 2pcs 08 Decorative cover and washer 4pcs 03 Door glass 2pcs 09 Wall anchor 8pcs 04 Rail connector 2pcs 10 Bolt M5x8 8pcs 05 Truss head screw ST4.2x40 8pcs 11 Door wheel 8pcs 06 Truss head screw ST4.2x10 4pcs Shower Enclosure Plan 52 7m m ) 34-1/2” min to 34-7/8” max 877mm min to 887mm max ©2018 DreamLine.
Installation steps 1. Place the Wall Profiles (#01) onto the threshold at a distance of 34-1/2” from the finished corner of the opening and mark their position on the wall at the threshold. Use a level to align the Wall Profiles (#01) vertically and mark the wall. (Refer to the Shower Enclosure Plan on page 5 and Fig 1) ! outside outside Measure from the finished corner of the shower to the outside of the wall profile at the threshold and draw a plumb line up from there.
3. Insert the Rail Connector (#04) into the guide rails of the Stationary Glass Assembly (#02). Drill a hole into the outer layer of the Rail Connector (#04), through the predrilled hole in the guide rails using an Ø1/8” drill bit. Fasten the top and bottom Rail Connector (#04) to the guide rails with the Flat Head Screw ST4.2×10 (#06). (Fig 3a and Fig 3b) ! NOTE: To prevent damaging the Rail Connector (#04), tighten but Do Not overtighten the screws. 1 2 3 Ø1/8” 4 5 6 Ø1/8” ©2018 DreamLine.
©2018 DreamLine. All Rights Reserved 4. Carefully align the assembled Stationary Glass Panels (#02) onto the Shower base and insert the Glass Profiles into the Wall Profiles (#01).
5. Insert two Door Wheels (#11) into the groove of the Upper Guide Rail, then attach the Door Glass (#03) to the Door Wheels (#11) using the Bolts M5×8 (#10). Repeat this procedure to attach the Door Glass (#03) to the Door Wheels (#11) in the Bottom Guide Rail. Be sure to install the doors so that the magnetic vinyl seals will meet in the corner. (Fig 5a and Fig 5b) 1 2 3 ©2018 DreamLine.
6. For smoother operation, if necessary, adjust the position of the Door Wheels (#11) within the slot in the Door Glass (#03) rail. Perform any final adjustments of the assembled unit within the Wall Profiles (#01) and make certain that the bottom rails are tight to the threshold. From inside the shower, drill holes into the first layer of the Wall Profile and the Glass Profile (Fig 6.2) using an Ø1/8” drill bit. Secure the Glass Profile to the Wall Profile using the Round Head Screws ST4.
7. Use a good quality mildew-resistant silicone to seal the connections between the Wall Profiles and the walls, and where the Bottom Guide Rail meets the threshold. (Fig 7) ! Allow 24 hours for the silicone to cure before using the shower. ©2018 DreamLine.
Product Maintenance BASES and BACKWALLS: To ensure long-lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface. GLASS: To ensure long-lasting life for your glass shower products, wipe them off after each use with a soft cloth.
TEL: 866-731-2244 FAX: 866-857-3638 DREAMLINE.COM For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.com ©2018 DreamLine.