User Manual

“INFINITY-Z” Rev.2 Ver.4 08/2013
8
9. Move the finished frame to the designated position on
the shower base, the bathtub or the threshold
(depending on your installation); push it against the
walls. If your top and bottom wall opening
measurements are different or if the walls are out-of-
plumb, make adjustment by slightly pulling the Wall
profiles out of the Glass Profiles.
Use the level to adjust the frame in the vertical position
See Fig. 9 for details.
Fig. 9
10. Using help to hold this assembly in the right position,
mark the drill holes on the wall through the holes on
the flange of the Wall Profile.
Gently set the assembled unit aside; drill the holes
using Ø 5/16” drill bit and insert the Wall anchors
(14).
Apply silicone along the wall profile and around the
holes on the wall. Also apply silicone caulk under the
bottom Guide rail (03). Place the whole shower
assembly back in the designated position and secure
it to the walls using the Round head screws
ST4.2×30 (9).
See Fig. 10 for details.
Fig. 10
Ø 5/16”
2
1
3
4
5