Owner Manual

Installation steps
©2017 DreamLine. All Rights Reserved
INFINITY-Z manual Ver 4 Rev 5 06/2017 6
TIP: For easier installation into the opening, cut off an extra 1/4”:
FINISHED OPENING (W) - 3-5/8”= FINISHED CUT LENGTH “D”
Fig 1
Fig 2
Fig 3
W
Bottom
Middle
Top
Panel end
Door end
D
D
D
FINISHED OPENING - 3-3/8"=FINISHED CUT LENGTH “D”
NOTE: The Top and Bottom Guide Rails (#03)
are shorter than the model size by design. They
have been precut for your model width and are
made to fit between the wall profiles, (not wall to
wall). See the table below:
48” (for shower) 44-5/8”
54” (for shower) 50-5/8”
60” (for shower) 56-5/8”
60” (for tub) 56-5/8”
Model Size
Precut
Rail Length
2. Subtract 3-3/8” from your finished opening (W) to
determine the finished cut length for the Top and
Bottom Guide Rails (#03). Cut the Top and Bottom
Guide Rails (#03) to the finished cut length “D”.
Cut from the door end only, (which is the end farthest
from the glass holder hole) and cut each rail to the same
length from the same end. (Fig 2 and Fig 3)
1. Measure the distance between the two finished
walls at the top (at model height: 58” or 72”), middle
and bottom. The wall profiles will adjust for
out-of-plumb conditions, so use the smallest
measurement as the “finished opening”
dimension to determine the finished cut length in
Step #2. (Fig 1)