Instructions / Assembly
System Diagram And Definitions
A) RO Faucet B) RO Faucet White Quick Connector C) RO Shut-off Valve
D) Drain Saddle Valve E) Water Tank Shut-off Valve F) Flush Valve
G) RO Membrane Housing H) Pressure Water Tank I) Anti-Leak Protector
J) 1
st
Stage Filter Housing K) 2
nd
Stage Filter Housing L) 3
rd
Stage Filter Housing
* DO NOT DRINK THE FIRST TANK OF WATER.
* Check for leakage daily for the first week and periodically thereafter.
* Always flush the new filters as instructed.
1)After the system is set up, please carefully inspect all the connection, joints for possible loosen
parts or connections.
2)After inspection is complete, please keep the Tank Shut-off Valve at OFF position, and keep the
Flush Valve at ON position. Prepare a bath towel and a water container to catch any water
leak. Top 3 causes of leaking are
•The tubing was not fully inserted and secured.
•The O-ring was not in place or kinked.
•Loosen cap/housing.
3)Unplug the white RO tubing that located at left side of the pre-filtration filter housing, as shown
in Figure A-Flush.
4)First turn on Water Shut-off Valve, water would come out from the left side. Wait for 15 Minutes
for the system to flush and condition the filters. *Water first comes out black due to loose
harmless carbon residuals, which is normal.
5)Turn OFF the Water Shut-off Valve, re-connect and secure the White RO Tubing.
6)First Turn on RO Faucet and slowly turn ON the Water Shut-off Valve , then check for water
leak.
7)Turn OFF RO Faucet, then turn ON the Tank Shut-off Valve. Wait for the water storage tank to
be filled up.
8)Drain the first tank of water and then you can start enjoy the purified water!
Completed system inspection and start up
Figure A-Flush
PPGACCTO
Water flushes through the tubing, enters the Post Carbon Filter, and exits from the system (B)
C
D
E
B
08 09