Installation Guide

Installing Your Water 1000 Pro Series
Installing Your Water 1000 Pro Series 2-24
Diagram 2.4.4 Connect Tubing To Shuto Valve
5. Make sure the valve handle is closed by turning it clockwise as far as it will go. When
closed, the handle extends out perpendicularly to the length of the shuto valve.
Diagram 2.4.5 Ensure Valve Is Closed
6. Once you’ve conrmed that the valve is closed, open the valve at your water source (by
turning counter clockwise) to enable the water to ll the tubing, ensuring there are no
leaks in either end of the connections to the water line.