Installation Guide
Installing Your Water 1000 Pro Series
Installing Your Water 1000 Pro Series 2-24
Diagram 2.4.4 Connect Tubing To Shuto Valve
5. Make sure the valve handle is closed by turning it clockwise as far as it will go. When
closed, the handle extends out perpendicularly to the length of the shuto valve.
Diagram 2.4.5 Ensure Valve Is Closed
6. Once you’ve conrmed that the valve is closed, open the valve at your water source (by
turning counter clockwise) to enable the water to ll the tubing, ensuring there are no
leaks in either end of the connections to the water line.