Installation Guide
Installing Your Water 1000 Pro Series
Installing Your Water 1000 Pro Series 2-41
Diagram 2.6.5-B - Merging Connections to Brass Compression Tee For Parallel Conguration
Final Check
4. Your Acc. Appliances should be connected to
E
1/4 in. Brass Compression Tee,
and there should be a section of
A
1/4 in. White PP Tubing running from there to
where your Drinkpod 1000 Pro Series will be located, with
C
1/4 in. Quick Connect Shuto Valve attached to the other end.
acc.
P
Also, for Parallel Conguration, the section of
A
1/4 in. White PP Tubing
running from your Water Source should have the Quick Connect Shuto Valve
removed from it, and be connected to the top port of the Brass Compression Tee.
If all of the above is correct, you’re ready to proceed to the next stage, “Connecting
Water Optimizer” on page 2-43. If not, review the instructions and make any
necessary corrections before proceeding. For ‘visual’ users, we’ve provided simplied
reference diagrams to double check your work.