Installation Guide

Installing Your Water 1000 Pro Series
Installing Your Water 1000 Pro Series 2-43
Connecting Drinkpod 1000 Pro Series
Congratulations! You are now close enough to the end that you should be able to taste it.
This is the second easiest of the nal stages.
You should either have one or two water lines that end in
C
1/4 in. Quick Connect Shuto Valve(s) running to where you plan on locating your new
Drinkpod 1000 Pro Series. The rst (or only) should be from your Water Source or
E
1/4 in. Brass Compression Tee (for Parallel Conguration). We will refer to this line as
your Source Line. The second (if applicable) should be from your Accessory Appliance, or
1/4 in. Brass Compression Tee if you have 2 Accessory Appliances. We will refer to this
as your Accessory Line.
1. Move your new Drinkpod 1000 Pro Series to its nal location. Do not plug the power
cord in yet.
2. Cut nal short section(s) of tubing from 1/4 in. White PP Tubing to run from the
C
1/4 in. Quick Connect Shuto Valve(s) to your Drinkpod 1000 Pro Series’s ports.
Be sure to include enough additional length to allow you to pull your 1000 Pro Series
away from the wall (for maintenance).
3. Now connect the section(s) of
A
1/4 in. White PP Tubing to the open port(s) on
the
C
1/4 in. Quick Connect Shuto Valve(s) of your Source Line and
Accessory Line (if applicable). Use the standard quick connect method to attach them.
Diagram 2.7.3 Connect Tubing To Shuto Valve
A