Installation Guide

Installing Your Drinkpod
Installing Your Drinkpod 2-12
Running Water Source Line
It’s time to run your water line (tubing) from your water source to where your DRINKPOD
will be place. For this section, you will require
1. Uncoil and run
A
1/4 in. White PP Tubing, from where its connected (to your
water source) to wherever you intend to locate your DRINKPOD. Make any necessary
adjustments (i.e. drilling holes) as you go.
2. Once you have the water line tubing ran all the way to where your DRINKPOD will be
placed, measure out a 1 - 2 ft. of additional tubing. You want to ensure you have sucient
slack to pull the DRINKPOD away from the wall for maintenance.
3. Cut the tubing using your scissors or knife. Be careful to cut the tubing straight across (at
a 90 degree angle) to avoid leaks.
Diagram 2.4.3 Cut Tubing
4. Now, insert the open end of
A
1/4 in. White PP Tubing into one end (doesn’t matter
which) of
C
1/4 in. Quick Connect Shuto Valve. Continue to rmly insert tubing
into opening until it won’t go any further. Then pull tubing backwards (away) from valve,
using medium force, to engage/extend the compression sleeve on the valve, and ensure
the connection is secured.