Specifications

DRI-STEEM CRUV Electric Humidifier Installation, Operation, and Maintenance Manual • Page 9
Installation
Piping:
DI/RO water option
Figure 9-1:
CRUV (DI/RO water option) field piping overview
Notes:
Locate air gap only in spaces with adequate temperature and air movement to absorb flash steam; otherwise, condensation may form on nearby surfaces.
Refer to governing codes for drain pipe size and maximum discharge water temperature.
Offset humidifier from floor drain to prevent flash steam from rising into the humidifier.
Dashed lines indicate provided by installer.
The water supply inlet is more than 1" (25 mm) above the skim/overflow port, eliminating the possibility of backflow or siphoning from the tank. No
additional backflow prevention is required; however, governing codes prevail.
Damage caused by chloride corrosion is not covered by your DRI-STEEM warranty.
Install plumb
DC-1135
Steam vapor hose
Water inlet strainer, by installer
Skim/overflow port
If run is over 10' (3 m), increase
pipe to 1¼" (DN32)
1" (25 mm) air gap
Pitch 1/8"/ft (1%)
6" (152 mm)
recommended
Open drain required. See first note below.
Tank surfaces will reach 212
°F (100 °C) when operating.
Provide outer protection
from direct contact, but
allow for natural ventilation.
If water piping to humidifier is nonmetallic, we recommend
a 2" (50 mm) stainless steel water seal or loop in the supply
line to isolate steam during maintenance
Water supply inlet
12" (305 mm)
minimum
¾" (DN20) union for skim, drain, and overflow
connection; plumbing rated for 212 °F (100 °C)
Tank support
Water supply line:
¼" NPT (DN8) connection size
25 to 80 psi (175 to 550 kPa) required
water pressure
First 3’ (1 m) of supply line must
be rated for 212 ºF (100 ºC)
mc_071210_1604