Specifications

DRI-STEEM CRUV Electric Humidifier Installation, Operation, and Maintenance Manual • Page 29
If an item in the Start-up checklist below does not apply to your
system, skip to the next item and continue the process.
Read this manual and all other information that was provided
with your humidifier.
Verify that all field wiring is done according to the instructions
in this manual and in the humidifier wiring diagram.
Confirm that the input signal is consistent with the
Vapor-logic4 controller's expected input signal. Input signals are
listed in the Vapor-logic4 Setup menu. See “Installation Step 2:
Setup” in the Vapor-logic4 Installation and Operation Manual.
Turn on the water supply, and confirm that the drain valve is
closed.
Turn on power to the humidifier, and confirm the Main menu
is displayed on the keypad/display. The display may take several
seconds to appear as the controller powers up.
Confirm in the Main Menu that the mode is “Auto” and that
tank status is “Filling.”
When “Filling” appears in main menu, confirm that the tank is
filling with water.
In the Status screen, confirm that the Duct Airflow Switch is
closed.
In the Status screen, confirm that the high limit humidistat
input is closed or the high limit transmitter is connected.
Make sure the tank has filled with water. See the “Damage from
dry startup” Caution on Page 27.
With sufficient water in the tank, the airflow switch closed, the
high limit closed, and the humidifier getting a call for humidity,
verify that the heater outputs are activated.
Check the amp draw of the heaters. Refer to the humidifier
wiring diagram for the proper rating.
If you experience difficulties, have the keypad/display
information available along with the serial number and
humidifier Model, and call DRI-STEEM Technical Support at
800-328-4447.
mc_060210_1355-CRUV
Start-up checklist
Vapor-logic4 controller
Operation