Specifications
Page 26 • DRI-STEEM XT Electrode Steam Humidifier Installation, Operation, and Maintenance Manual
Installation
Dispersion:
Interconnecting piping requirements
Figure 26-1:
Piping connections to Single dispersion tube, Rapid-sorb, and Ultra-sorb Model LV or LH dispersion assemblies
Steam hose and clamps are provided with these humidifiers.
Steam outlet connections to tubing or pipe
(XT models 30, 50, 75 shown)
Hose clamp
Hose clamp
1½” (DN40)
tubing or pipe
(must be grounded)
OM-7623
Steam outlet connections to steam hose
(XT models 5, 10, 20 shown)
1” (DN25) steam hose
OM-7622
1½” (DN40) I.D.
steam hose
Hose clamp
1½” (DN40) steam
hose
Connector kit
(provided)
To dispersion assembly
Pitch steam hose 2”/ft (15%)
toward dispersion assembly.
To dispersion assembly
Pitch steam hose 2”/ft (15%)
toward dispersion assembly.
mc_091010_1004










