Product Manual
5.3 Installation of the assembled plenum on the furnace
Identify the left side of the plenum, it is
provided with holes for the installation of the
“RTD” thermal probe.
Also, 5 holes are aligned with the fold of the
top of the furnace on the
left
side and three
holes on the other sides. This allows you to
secure the plenum properly.
Install the assembly on the furnace, taking
care to insert the 4 folds on top of the furnace
inside the plenum.
Using 14 screws (C), secure the plenum to
the furnace.










