Product Manual

8 Tool Holder Installation
Components supplied with the device for the installation of the holder:
Type A #10
black screws (A)
Tool Holder (B)
Heat Exchanger
Scraper(C)
Poker (D)
The tool holder can be installed on the right
side of the furnace (1) or on a wall (2) near
your furnace. For installation on a wall, use
two E screws appropriate for the material to
which the holder will be attached.