11.6.Test Procedure
1) Setup the EUT and test generator as shown on Section 12.1.
2) For line to line coupling mode, provide a 1.0KV 1.2/50us voltage surge (at open-circuit
condition) and 8/20us current surge to EUT selected points.
3) At least 5 positive and 5 negative (polarity) tests with a maximum 1/min repetition rate are
conducted during test.
4) Different phase angles are done individually.
5) Record the EUT operating situation during compliance test and decide the EUT immunity
criterion for above each test.
11.7.Test Results
PASS.