User Manual

Table Of Contents
BST Testing (Shenzhen) Co.,Ltd. Report No.: BSTXD200414607301ER
Add: No.7, New Era Industrial Zone, Guantian, Bao'an District, Shenzhen, Guangdong, China
Certificate Search: http://www.bst-lab.com, Tel:400-882-9628, 8009990305, E-mail:christina@bst-lab.com
Page 28 of 36
12.6.Test Procedure
1) Set up the EUT and test generator as shown on Section 14.1.
2) The interruptions is introduced at selected phase angles with specified duration.
3) Record any degradation of performance.
12.7.Test Result
PASS.
Please refer to the following page.