User Manual
Table Of Contents
- TEST REPORT DECLARATION
- 1.TEST RESULTS SUMMARY
- 2.GENERAL INFORMATION
- 3.PRODUCT DESCRIPTION
- 4.TEST EQUIPMENT USED
- 5.POWER LINE CONDUCTED EMISSION TEST
- 6.RADIATED EMISSION TEST
- 7.HARMONIC CURRENT EMISSION TEST
- 8.VOLTAGE FLUCTUATIONS & FLICKER TEST
- 9.ELECTROSTATIC DISCHARGE TEST
- 10.ELECTRICAL FAST TRANSIENT/BURST TEST
- 11.SURGE TEST
- 12.VOLTAGE DIPS AND INTERRUPTIONS TEST
- APPENDIX I
- APPENDIX II
BST Testing (Shenzhen) Co.,Ltd. Report No.: BSTXD200414607301ER
Add: No.7, New Era Industrial Zone, Guantian, Bao'an District, Shenzhen, Guangdong, China
Certificate Search: http://www.bst-lab.com, Tel:400-882-9628, 8009990305, E-mail:christina@bst-lab.com
Page 28 of 36
12.6.Test Procedure
1) Set up the EUT and test generator as shown on Section 14.1.
2) The interruptions is introduced at selected phase angles with specified duration.
3) Record any degradation of performance.
12.7.Test Result
PASS.
Please refer to the following page.