4. Identify unit as using either:
•leadcalciumbatteries(standardmodels,i.e.LM30,LMP66)or
•nickelcadmiumbatteries(modelnumberendingwith“N”,i.eLM30N,LMP50N-12V)
5. Connect remote lamps (if used) to blue (+, fused) and yellow (–) leads (Fig. 1 or Fig. 2).
6. Connect120or277VACinputconnectionstotransformer(Fig.1orFig.2).Connectgreenwiretobuildingground.
Note:insulatetheunusedtransformerleadtopreventpotentialshockhazard.
•UnitsSuppliedWithLeadCalciumBatteries
7. DetermineproperbatteryorientationfromFig.3(singleharnessleadconnection)orFig.4(doubleharnesslead
connection).Batteryispositionedtotheleftofthecircuitboard.Removeprotectivelinerfromdoublesidedtape,locatedon
oorofenclosure.
Note:a1/4”space(minimum)isrequiredbetweenthefrontofthebatteryandtheinnerlipoftheenclosuretoprovide
clearanceforcover.Placebatteryintoenclosure,andpressdownrmlytosecurebatterytoenclosure.
8. Connectpositive(+,red)andnegative(–,yellow)batteryharnessleadsfromprintedcircuitboardtocorrespondingbattery
terminals as shown in Fig. 3 or Fig. 4.
9. Check all wiring for loose or missing connections.
10. Replacecover.Besurethateach“starwasher”isproperlypositionedbetweenthescrewheadandtheoutersurfaceofthe
cover.Tightenretainingscrews.Adjustlightingheadstodesiredposition.
11. EnergizeunitwithACpower.Pressandholdthe“TEST”button(seeFig.1for“TEST”buttonlocation)toconrm
illuminationandproperaimingofemergencylamps.(“ACON”indicatorLEDshouldgooff).Releasethe“TEST”button;
emergencylampsshouldextinguish.Normaloperationbegins.
12. NormalOperation:withpowersupplied,“ACON”LEDindicatorisilluminatedandemergencylampsareoff.
•UnitsSuppliedWithNickelCadmiumBatteries
7. DetermineproperbatteryorientationfromFig.5(singleharnessleadconnection)orFig.6(doubleharnesslead
connection).Batteryispositionedtotheleftofthecircuitboard.Removeprotectivelinerfromdoublesidedtape,locatedon
the battery.
Note:a1/4”space(minimum)isrequiredbetweenthefrontofthebatteryandtheinnerlipoftheenclosuretoprovide
clearanceforcover.Placebatteryintoenclosure,andpressdownrmlytosecurebatterytoenclosure.
8. Connect battery harness leads from printed circuit board to corresponding battery harness leads as shown in Fig. 5
or Fig. 6.
9. Check all wiring for loose or missing connections.
10. Replacecover.Besurethateach“starwasher”isproperlypositionedbetweenthescrewheadandtheoutersurfaceofthe
cover.Tightenretainingscrews.Adjustlightingheadstodesiredposition.
11. EnergizeunitwithACpower.
Note: allow unit to charge for 24 hours prior to testing.
Pressandholdthe“TEST”button(seeFig.2for“TEST”buttonlocation)toconrmilluminationandproperaimingof
emergencylamps.(“ACON”indicatorLEDshouldbeoff).Releasethe“TEST”button;emergencylampsshouldextinguish.
Normal operation begins.
12. NormalOperation:withpowersupplied,“ACON”LEDindicatorisilluminatedandemergencylampsareoff.
ROUTINE TEST CYCLING
1. Monthly:Iftherehasbeennopowerfailure,pressandholdthe“TEST”buttonforatleastthirty(30)seconds
toconrmemergencylampoperation.Release“TEST”buttontoreturntobatterychargingmode.
2. Onceayear:Performafullbatteryconditioningcyclebyde-energizingtheACcircuittowhichtheunitisconnected,and
allowtheunittooperateforninety(90)minutesonbatterypower.Followingsuccessfultest,energizeACcircuittobegin
battery charging cycle.
Note: ACONLEDblinkswhenbatteryisfullycharged.
REPLACINGEMERGENCYLAMPSANDBATTERIES
General •Battery
1. De-energizetheACpowersupplytotheunit. 4. Removedefectivebattery.Recycleresponsibly.
2. Removeenclosurecover. Replacewithgenuinemanufacturerbatteryonly.
3. Disconnectpositive(+,red)batterylead(nickel cadmium models- 5. Placenewbatteryinenclosure.Make
disconnectbatteryandprintedcircuitboardconnectors). connectionsfollowingstepsoutlinedabove.
6. Test unit.
•EmergencyLamp
PlasticSealedBeamTypeHeads PlasticSealedBeamHeads MetalHeads
4. Gentlyprylamplens 4. Prytoremove 4. Gentlypryretainingring
atarrowindicatormarks outerring. outofgrooveto
toremovelens. 5. Replacelamp. accesslamp.
5. Replacelamp. 5. Replacelamp.
Fig. 1 Pure-LeadOrLead-CalciumBattery
Fig. 2 Nickel-CadmiumBattery
Fig. 3 Single Harness Lead Connection
Pure-LeadOrLead-CalciumBatteries
Cover
Retaining
Screw &
Star Washer
Ground
Wire
(Green)
Tape,
Double Sided
Transformer Ground
Wire (Green)
RemoteDCLamps
Positive(+)LeadWith
“On-Board”Fuse
RemoteDCLamps
Negative(–)Lead(s)
Transformer
120VAC–White&Black
277VAC–White&Red
Note: PotentialShock
Hazard–Insulate Unusead
Lead
Test Switch
“ACOn”LED
YellowNegative(–)
BatteryLead
RedPositive(+)
BatteryLead
RemoteDCLamps
Positive(+)Lead(s)
With“On-Board”Fuse
RemoteDCLamps
Positive(+)Lead(s)
With“Off-Board”Fuse
RemoteDCLamps
Negative(–)Lead(s)
Ground
Wire
(Green)
Cover
Retaining
Screw &
Star Washer
Transformer–“OffBoard”
(ModelLM15NHas“OnBoard”
Transformer
120VAC–White&Black
277VAC–White&Brown
Note: PotentialShockHazard
–Insulate Unusead Lead
BatteryLeads
& Connectors
Test Switch
“ACOn”LED
Plate
Ground
Wire
(Green)
RemoteDCLamps
Negative(–)Lead
(Yellow)
RemoteDCLamps
Positive(+)Lead
“On-Board”Fuse
(Blue)
12VoltPack
TopView
12VoltPack
12VoltPure-LeadPack
12VoltSingle
6VoltSingle
Enclosure
CircuitBoard
Tape, Typical
6VoltSinglePure-Lead