Installation Guide

Separate the tubing and parts from front
to back as the backs are installed first.
Front tubing is smooth and smaller to
ensure a secure fit. Be sure to keep
screws with the applicable part.
Place the wall cover over the installation
hole. Once it is properly aligned, secure
the wall cover flush to the outer wall by
fastening with screws into the predrilled
holes.
Carefully place and fasten your refrigerant,
plumbing or any other necessary piping
to fit along the inside of the backs of the
now secured tubing.
First, snap tightly the front cover of tubing
over the back cover. Then, snap the front
covers of the other parts onto the backs
for a smooth finished appearance. Using
applicable screws, secure the front parts
into the predrilled holes.
Align evenly and place the back tubing
slightly inside the wall cover. Drill one hole
(not predrilled) in the center of the tube
and fasten with a screw. Secure backs of
the coupler and/or elbow (if included) by
fastening with the applicable screws into
the middle predrilled holes.the middle predrilled holes.

Summary of content (1 pages)