Installation manual

18

e boiler is furnished with a factory installed relief valve in
the top of the boiler. Provide ¾” piping from the supplied
relief valve to a local oor drain, but leave an air gap between
piping and drain. No shuto of any description shall be placed
between safety relief valve and the boiler, or on the discharge
pipes between such safety valve and the atmosphere. Instal-
lation of the safety relief valve shall conform to ANSI/ASME
Boiler and Pressure Vessel Code, Section IV. e manufacturer
is not responsible for any water damage.

Determine required system ll pressure, system design tem-
perature, and system water content. Boiler contains 2.6 gallons
(U.S.). Size expansion tank accordingly. Consult expansion
tank manufacturer for proper sizing information. Connect
properly sized expansion tank (not furnished) as shown in
Figure #6 for diaphragm type expansion tank and
Figure #7
for conventional closed type expansion tanks. For diaphragm
type expansion tanks, adjust the tank air pressure to match the
system ll pressure. Install air vent (furnished) as shown for
diaphragm type expansion tank system only. Install make-
up water connections as shown per local codes. If a pressure
reducing valve is used, adjust to match the system ll pressure.
In connecting the cold make-up water supply to the boiler,
make sure that clean water supply is available. When the water
supply is from a well or pump, sand strainer should be installed
at the pump.

