EMPIRE II SERIES II Models 3EW.65 3EW.75 3EW1.00 4EW.90 4EW1.25 4EW1.50 5EW1.20 5EW1.75 OIL-FIRED CAST IRON HOT WATER INSTALLATION, OPERATION & MAINTENANCE MANUAL Maximum Allowable Working Pressure 50 psi. Manufactured by: ECR International, Inc. 2201 Dwyer Avenue, Utica NY 13501 web site: www.ecrinternational.com An ISO 9001-2008 Certified Company P/N# 240009549, Rev.
SAFETY NOTICES Introduction Safety Notices............................................... 2 Empire Water boiler is a natural draft oil fired hot water boiler comprised of cast iron sections. Empire Water boiler is available with 3, 4, or 5 cast iron sections. These sections are held together by cast iron push nipples. Boiler Ratings And Capacities.......................... 3 Fresh Air For Combustion............................... 7 System Piping...............................................
BOILER RATINGS AND CAPACITIES Figure 1 - Dimensions 1 1/4” BOILER RATINGS AND CAPACITIES BOILER MODEL NO. Without Tankless Coil 3EW.65 3EW.75 3EW1.00 4EW.90 4EW1.25 4EW1.50 »5EW1.20 5EW1.75 INPUT +gph *Mbh **HEATING CAPACITY *Mbh 0.65 0.75 1.00 0.90 1.25 1.50 1.20 1.75 91 105 140 126 175 210 168 245 80 92 120 111 151 179 147 210 ‡NET AHRI RATING WATER *Mbh 70 80 104 97 131 156 128 183 A.F.U.E. ++ NO. SEC. MINIMUM CHIMNEY SIZE/ HEIGHT 86.3 85.2 84.0 86.0 85.0 84.0 86.5 84.
SAFE INSTALLATION AND OPERATION ! WARNING NOTICE This boiler has been designed for residential installations. If used for commercial applications, all jurisdictional requirements must be met. This may require wiring and/or piping modifications. Manufacturer is not responsible for any changes to the original design. Burn and scald hazard. Safety relief valve could discharge steam or hot water during operation. Install discharge piping per these instructions. 11.
LOCATING THE BOILER 1. Place boiler in location centralized with the piping Complete Prior To Installing Boiler. system and as close to chimney as possible. A. Verify you have selected the right size boiler with proper capacity. AHRI rating of boiler selected should be greater than or equal to calculated peak heating load (heat loss) for building or area(s) served by boiler and associated hot water heating systems. See boiler rating and capacity table previously listed in this manual.
OIL LINES OIL FILTER SHUT OFF VALVE OIL TANK 2" FILL PIPE MIN. 2" I.D.
FRESH AIR FOR COMBUSTION ! WARNING EXAMPLE 2: Boiler Located in Confined Space Asphyxiation, fire hazard. Do not obstruct air openings to combustion area. Follow instructions below, to maintain adequate combustion air. A. All Air from Inside the Building: Confined space shall be provided with two permanent openings communicating directly with additional room(s) of sufficient volume so the combined volume of all spaces meets the criteria for unconfined space.
FRESH AIR FOR COMBUSTION B. All Air from Outdoors: Confined space shall be provided with two permanent openings, one commencing within 12 inches of top and commencing within 12 inches of bottom of enclosure. Openings shall communicate directly, or by ducts, with outdoors or spaces (crawl or attic) that freely communicate with outdoors. 1.
SYSTEM PIPING 1. Installation of boiler for new heating system, 6. Verify clean cold water supply is available when Install all of radiation units (panels, radiators, baseboard, or tubing) and supply and return mains first. After all heating system piping and components have been installed, make final connection of system piping to boiler. It is recommended to mount circulating pump on supply side piping, such that it pumps away from expansion tank. Refer to figures on next pages.
SYSTEM PIPING Figure 7 - Bypass Piping Arrangement Diagram > LOW DESIGN WATER TEMPERATURE SYSTEMS > LARGE WATER CONTENT SYSTEMS > PIPING ARRANGED FOR “POWER PURGING” AIR OUT OF THE SYSTEM PIPING, REFER TO THIS MANUAL’S SECTION ON “FILLING THE SYSTEM WITH WATER” OPTION #1 10
SYSTEM PIPING Figure 8 - System Piping Arrangement Zoning With Zone Valves > CIRCULATOR ON SUPPLY PIPING PUMPS AWAY FROM EXPANSION TANK NOTE: CIRCULATOR CAN ALSO BE INSTALLED ON RETURN PIPING.
SYSTEM PIPING Figure 9 - System Piping Arrangement Zoning With Circulators > CIRCULATOR ON SUPPLY PIPING PUMPS AWAY FROM EXPANSION TANK > PIPING ARRANGED FOR “POWER PURGING” AIR OUT OF SYSTEM PIPING, REFER TO THIS MANUAL’S SECTION ON “FILLING THE SYSTEM WITH WATER” OPTION #1 12
SYSTEM PIPING Figure 10 - System Piping Arrangement Alternate Near Boiler Piping > > DIAPHRAGM EXPANSION TANK MOUNTED OFF THE BOILER > CIRCULATOR ON SUPPLY PIPING PUMPS AWAY FROM EXPANSION TANK 13 PER THIS MANUAL, USE OPTION #2 IN “FILLING THE SYSTEM WITH WATER” > THIS PIPING ARRANGEMENT CAN BE USED WITH ZONE VALVES OR ZONE CIRCULATORS
SYSTEM PIPING Tankless Coil Piping Arrangement Boilers may be factory packaged with tankless heater coil see figure below. Coil provides instantaneous heating of water for domestic use if proper burner and water supply line controls are used. Tankless coils are meant to provide domestic hot water for intermittent draws, not continuous flow. NOTICE Boiler Model Burner Input Rate (gph) Input (MBH) Tankless Rating (gpm)‡ 3EW.65 0.65 91 2.90 3EW.75 0.75 105 3.00 3EW1.00 1.00 140 3.
SYSTEM PIPING ARRANGEMENT Antifreeze added to boilers must be nontoxic, and must be of type specifically intended for use in closed hydronic heating systems. Under no circumstances should automotive antifreeze be used. Antifreeze used in any boiler may reduce capacity by 10% or more and increase fuel consumption. Tankless coil performance will fall as concentration of antifreeze is increased. Refer to boiler and piping water volumes tables.
CHIMNEY AND CHIMNEY CONNECTIONS ! WARNING For oil fired boilers for connections to vents or chimneys, vent installations shall be in accordance with applicable provisions of INSTALLATION OF OIL BURNING EQUIPMENT, NFPA31 latest revision, and applicable provisions of local building codes. Fire Hazard. Maintain minimum vent pipe clearance of 18” from surface of vent to wood and other combustible materials. Failure to comply may result in death or serious injury.
TYPICAL CHIMNEY CONNECTION Figure 12 -Typical Chimney Connection MINIMUM HEIGHT: MUST BE AT LEAST 3 FT (.9m) HIGHER THAN HIGHEST PART OF PASSAGE THROUGH ROOF. MUST BE AT LEAST 2 FT HIGHER THAN ANY NEIGHBORING OBJECT WITHIN 10 FT. MUST MUS HAVE AN UNOBSTRUCTED TOP OPENING.
ELECTRICAL CONNECTIONS ! WARNING Electrical shock hazard. Turn OFF electrical power supply at service panel before making electrical connections. Failure to do so could result in death or serious injury. Thermostat Install 24 Volt thermostat (not provided) in proper location. Location of thermostat has effect on boiler system operation. Follow instructions included with thermostat. Grounding Permanently ground boiler according to local codes and latest revision of the National Electrical Code.
FILLING THE BOILER How A Hot Water System Operates Entire heating system (boiler, piping, and radiation units) is filled with water. As water in the boiler is heated, it is circulated from top of boiler through supply main to radiation units. Cooler water in radiation units flows back through return piping through return main into the boiler. This arrangement provides positive and rapid response to the thermostat. OPTION #2 • Close air vents on all radiation units. • Open valves to radiation units.
OPERATING THE BOILER Air Supply For Combustion: Start: Fill entire system with water. Vent all air from • Do not install boiler in rooms with insufficient air, unless corrective steps are taken. • It may be necessary to install windows or cut holes in a door to rooms used for supply air to obtain sufficient combustion air and prevent less than atmospheric air pressure in that room. • If there is a lack of combustion air, burner flame will be dark orange and formation of soot will occur in heating unit.
OPERATING THE BOILER Nozzles And Electrodes: Use proper size, spray angle, and spray pattern nozzle. Refer to recommended nozzle selection charts. To install nozzle, remove nozzle line electrode assembly, if necessary remove retention ring assembly, and install and tighten nozzle. Take care not to damage electrode insulators or bend electrode tips. After installing nozzle, reassemble nozzle line electrode assembly and set electrode tip spacing.
OPERATING THE BOILER Figure 13 -Burner Adjustments and Settings 22
CHECKING AND ADJUSTING CONTROLS ! WARNING Burn, scald hazard. Do not attempt to start the burner when excess oil has accumulated, when the unit is full of vapor, or when the combustion chamber is very hot. Check Thermostat Operation: Follow instructions included with your thermostat. Locate thermostat five feet above the floor on inside wall.
MAINTENANCE Annually: Recommend flue passages, combustion Diaphragm Expansion Tank: Tank may become Before The Start Of Each Heating Season (or when Water System: If system is to remain out of service chamber area (target wall, fire door insulation, durablanket), burner adjustment, control operation, and boiler seals (fire door gasket or silicone seal, cast iron sectional seals, flue collector) be checked once each year by trained Service Technician. water logged.
OIL BOILER / BURNER CLEANING INSTRUCTIONS Oil Boiler Cleaning: 6. Carefully vacuum soot accumulations from combustion chamber area, take care to not damage any of refractory or blanket insulation. To gain access to combustion chamber first check that shut off valve on fuel oil line is closed and disconnect fuel oil line. Open swing door by removing whiz lock nut holding door shut. 1. Shut off all electrical power to boiler / burner and shut off fuel oil supply. 2. Remove vent pipe from top of boiler.
OIL BURNER CLEANING These are general instructions for cleaning an oil burner. For specifics, consult burner manufacturer’s instructions. ! WARNING Electrical shock hazard. Turn OFF electrical power supply at service panel before making electrical connections. Failure to do so could result in death or serious injury. 1. Verify all electrical power to boiler / burner and fuel supply to burner are shut off. 2.
SERVICE HINTS You may avoid inconvenience and service calls by checking these points before you call for service: IF YOUR SYSTEM IS NOT HEATING OR NOT GIVING ENOUGH HEAT . . . POSSIBLE CAUSE WHAT TO DO Thermostat is not set correctly Reset thermostat Burner is not operating properly Check flame. If it is yellow, the burner is not getting enough air. Or, if flame is blue and noisy and seems to lift off the burner, the burner is getting too much air. Contact your service technician.
* When Low Limit Is Used, Set ELL Parameter On L7248 Honeywell Control To On. Boilers Factory Equipped With Tankless Coil Are Factory Set To On.
* When Low Limit Is Used, Set ELL Parameter On L7248 Honeywell Control To On. Boilers Factory Equipped With Tankless Coil Are Factory Set To On.
ELECTRICAL WIRING Figure 18 - Honeywell L7248L Control Wiring with Zone Pumps and Argo ARM Switching Relay (With Tankless Coil Shown) 30
EQUIPMENT AND OPTIONAL ACCESSORIES MAIN AIR VENT: for down flow systems or diaphragm type expansion tanks (not provided) Before system is filled with water, there is air in pipes and radiation units. Some air will be trapped as system is filled. It is possible to eliminate most of this air through air vents on radiation units. Main air vent will speed and simplify this process. Install main air vent on highest point in supply main when all radiation is below top of boiler.
DUNKIRK BOILERS 2201 Dwyer Avenue, Utica NY 13501 web site: www.ecrinternational.