Installation Guide

3
Camelot Trellis
Lay out right post (part 2). Starting at
bottom (flared end), insert bottom cross
rail (part 4) and center cross rails (part 3).
Slide left post (part 1) over corresponding
cross rails.
Insert 58” vertical rail (part 5) through
center hole of cross rails.
1
2
3

Summary of content (2 pages)