Installation Instructions

Dura-Trel, Inc. ~ PO Box 122, Sheboygan Falls, WI 53085 ~ Toll Free 877-258-6020
#11159 COTTAGE TRELLIS
ASSEMBLY INSTRUCTIONS
TOOLS REQUIRED:
Drill w/ #2 Phillip Bit or
Phillips Screwdriver
Super or Crazy Glue
Hammer or Mallet
TRELLIS ASSEMBLY
(Refer to Drawing)
On clean flat surface, lay the two 2 x 2 x 65" posts with screw pilot holes facing up and routed holes for
7/8 x 1 ½ x 29 ¾" cross rails facing each other. Insert one of the 7/8 x 1 ½ x 29 ¾" top/bottom rails into
the bottom routed holes in post, then insert the center rails.
Slide the 1 x 1 x 58" vertical rails through the routed holes of the cross rails and insert the last top/bottom
cross rail into the top of the posts guiding the 1 x 1's into the top rail. Firmly press the posts together so
that all cross rails are completely inserted in the posts.
Fasten the posts and cross rails with the ¾" screws and snap the screw caps over the screw heads.
Apply household glue to inside edges of 2 x 2 post caps and set on top of posts. Trellis is now ready for
installation (See Ground Anchor Hardware Bag).
If you encounter missing or defective parts, please contact manufacturer direct at toll free
# below.

Summary of content (3 pages)