Install Manual
8
4 PCS and Battery Cabinet Wall-Mounting Instructions
1. Mount the wall bracket to the wall. Use the available slot pattern to
mount to a load-bearing structure rated for the weight of the final
system. The slots accommodate a M8 (5/16”) bolt diameter.
IMPORTANT! Wall-stud mounting: A minimum of three wall
studs spanned within the width of the mounting bracket are
required. A minimum of two mounting bolts are required per
stud (top/bottom).
2. (not shown) Remove the battery cabinet from the packaging, and
stand the cabinet upright. Remove the front cover.
3. Mount the two leveling brackets to the back side of the cabinet.
Each side of the cabinet must have a rubber washer in direct
contact with the cabinet wall.
4. Lift the battery cabinet onto the wall mount bracket, aligning the
wall hooks at the rear of the cabinet with the slots on the load-
bearing face of the bracket.
5. Slide the battery cabinet towards the right end of the bracket to
allow for clearance for the PCS cabinet.
6. From the rear side of the cabinet, adjust the outer wingnuts on the
levelling brackets until the cabinet is vertically plumb (level) to the
wall.
1
3
4
3
9
8
D
-
14kWh
-
LFP
D
-
5kW
D
-
5kW
6