Install Manual

23
NOTE: If necessary, the load circuits can be shut off inside the backup panel to increase the battery charge rate.
Do not shut off the PV circuit.
10 Maintenance
This is a maintenance free product. Regularly scheduled inspection of the airflow path for the active cooling fans on the
bottom side of the PCS cabinet is all that is required. This inspection should occur on an annual basis, or coincide with PV
inspection.
If the fan ventilation holes are obstructed with dust / debris, a soft-bristled brush can be used to wipe them clean. For
heavy soiling use a soft, dry brush. Do not use any solvents, scouring, or corrosive materials to clean the unit. Never remove
or unplug connections or plugs during cleaning.
11 Serviceable Parts – Battery module removal/replacement
The battery modules within the battery cabinet are removable and/or replaceable. To replace or remove the battery
modules, follow the reverse instructions in section 5 of this manual.
DC
module
jumper cables
Press & hold the lock button
to release the cable from the
battery terminal.