User Manual
6
8 Configuration
8.1 Downloading the Installer App
Phone / Tablet: Use the QR code to download the app >>>
Web-browser:
https://pv.duracellpowercenter.app
8.2 Wi-Fi setup
1. Open the Installer App, and login using account credentials.
Note: First time users must request an account from the
reseller.
2. Click on the [Network Configuration] icon.
3. Select [Wi-Fi] and enter the customer supplied network and
password credentials.
4. Click [SEND TO DTU] to complete.
8.3 Creating the site map in the Installer App
1. Open the Installer App, and login using account credentials.
2. Select the [Station] tab at the bottom of the page, then select [+] at the top-right.
3. Select [Quick] for a single unit installation, or [Professional] for a mult-unit installation.
4. Fill in all fields applicable to the unit(s) being installed. Select [Next] when completed.
5. Select [Add DTU ID] then [scan], (or manually input the DTU ID). Select [Next] when completed.
6. Select [Start binding], then choose the angle/tilt for the PV array.
7. Select [scan microinverter ID], (or manually input the microinverter IDs as indicated on the
Installation Map sheet, and click the check box after completing each ID). Select [Next] when
completed.
8. Select [Finish] when all microinverter IDs have been added.
9. [Disable] the scan function (top-right) and design the Layout base on the installation. Select the
check box (top-right), and then select [Next] after completing the design.
10. Upload a picture of the site and select “Finish” to complete the site creation. The new site will
appear on the station list within the Installer account.
11. Select the [Networking] command button after ther power station has been created.
Note: It may take up to 30 minutes for the power station to appear online with all microinverter IDs
detected.