weekendwarrior | Peel & Stick LVT Installation Instructions
weekendwarrior | P&S LVT General Information Limitations WeekendWarrior is a peel-and-stick vinyl product that is designed to be installed in residential indoor applications only. This product must be installed over an approved substrate that is properly primed with a suitable latex-based primer - failure to do so could result in adhesion issues. Avoid prolonged exposure to direct sunlight or other heat sources where temperatures will exceed 90° F (32° C), as damage or deformation may occur.
weekendwarrior | P&S LVT Recommended Tool List • Knee Pads • Safety Glasses • Cut-Resistant Safety Gloves • Dust Mask • HEPA-Filtered Vacuum • Paint Roller & Floor/Wall Primer • Three-Section Wall Roller with Extendable Handle (~9 in. Wide) or Three-Section 100 lb. Floor Roller • Pencil • Speed Square • Tape Measure • Utility Knife with Blades • 6-foot and 1-foot Straight Edge or Level DuraDecor | P: (855) 700 - 5666 | customercare@duradecor.com | duradecor.com | revised on 06.23.
weekendwarrior | P&S LVT Flooring Installation Instructions 1. Floor Substrate Preparation Radiant Heating Substrates When installing floor covering over a substrate that contains a radiant heating system, ensure the radiant heat does not directly contact the floor covering and is set at the correct “in-service” temperature for 48-hours prior, during and after the installation. The radiant heat may be gradually increased or decreased to maintain the correct “in-service” site conditions.
weekendwarrior | P&S LVT Floor Installation Instructions use a pen or permanent marker. It is recommended that plank end joints be staggered randomly by at least 8 in. to avoid an undesirable “stair stepped” or “H joint” pattern (see figure 2). Tiles are recommended to be installed either in a brick-bond or a 1/3rd off-set pattern. and your body weight or a 100 lb. three-section roller (see figure 6). Failure to roll correctly may result in bond failure.
weekendwarrior | P&S LVT Flooring Installation Images Figure 1: Layout - Mark the starting line Figure 4: Cutting - Mark, score & snap downward Figure 2: Layout - Stagger seams Figure 5: Installation - Remove release paper Figure 3: Priming & Cleaning - Prime substrate Figure 6: Installation - Roll flooring with roller DuraDecor | P: (855) 700 - 5666 | customercare@duradecor.com | duradecor.com | revised on 06.23.
weekendwarrior | P&S LVT Wall Installation Instructions 1. Wall Substrate Preparation 2. Wall Installation Instructions Flatness Acclimation Drywall Substrates Layout Check all substrates for flatness - all areas should be smooth and flat. The recommended flatness tolerance is < 1/8-in. gap (2 x U.S. quarters) underneath a 6-ft. straight level and < 1/16-in. gap (1 x U.S. quarter) under a 1-ft. level. Make any necessary and appropriate adjustments to the substrate before installation.
weekendwarrior | P&S LVT Wall Installation Instructions visible defects or damage, as removal, subfloor repair and replacement labor costs will not be covered. Remove the release paper on the bottom of the tile and discard immediately in a trash can or bag (see figure 4). Follow the layout and starting line and carefully position each piece accordingly, keeping all joints snug without compressing the material (see figure 5).
weekendwarrior | P&S LVT Wall Installation Images Figure 1: Layout - Mark the starting line Figure 4: Installation - Remove release paper Figure 2: Layout - Stagger seams Figure 5: Installation - Install along starting line Figure : Cutting - Mark, score & snap downward Figure 6: Installation - Roll flooring with roller DuraDecor | P: (855) 700 - 5666 | customercare@duradecor.com | duradecor.com | revised on 06.23.